Practice Production Value of the Bulldozer - 1 | 4. Production Value of the Bulldozer | Construction Engineering & Management - Vol 2
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

Define job efficiency.

💡 Hint: Consider the time the bulldozer effectively operates within an hour.

Question 2

Easy

What is the soil density when the ideal soil is 1365 kg/m³?

💡 Hint: Compare it to the ideal standard.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is job efficiency?

  • 100% of available time
  • Effective working time as a percentage
  • Time spent on breaks

💡 Hint: Think about how to measure productivity.

Question 2

True or False: A higher soil density will increase the bulldozer’s productivity.

  • True
  • False

💡 Hint: Consider the weight of soil and machinery performance.

Solve 1 more question and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

If a bulldozer operates under poor visibility and has a correction factor of 0.8, and the ideal productivity is 100 loose meter cubes per hour, what is the adjusted productivity?

💡 Hint: Multiply the ideal value by the correction factor.

Question 2

Calculate the total cost per bank meter cube if the bulldozer incurs an operating cost of 1200 rupees per hour and operates at a density-adjusted productivity of 70 loose meter cubes per hour.

💡 Hint: Make sure to use the correct conversion for density adjustments in productivity.

Challenge and get performance evaluation