Practice Estimating Productivity - 1.5 | 14. Productivity of Shovel | Construction Engineering & Management - Vol 2
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What is the ideal angle of swing for maximum productivity?

💡 Hint: Think about the position between digging and dumping.

Question 2

Easy

What happens to productivity when the angle of swing is increased?

💡 Hint: Consider the impact on cycle time.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is the ideal angle of swing to maximize productivity?

  • 45 degrees
  • 90 degrees
  • 120 degrees

💡 Hint: Think about the position of the truck relative to the excavator.

Question 2

True or False: Increasing the height of cut improves productivity.

  • True
  • False

💡 Hint: Recall how productivity factors relate to height optimization.

Solve and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

A shovel has a heaped bucket volume of 4 cubic meters, a fill factor of 0.8, and operates at an actual height of cut of 3 meters with an optimum height of 4 meters. Calculate its productivity if the cycle time is 30 seconds.

💡 Hint: Pay attention to the difference between actual and optimum heights.

Question 2

Discuss how changes in the truck availability can alter the overall productivity of an excavation site and propose a management strategy to optimize machine scheduling.

💡 Hint: Consider how efficient truck scheduling can minimize idle times.

Challenge and get performance evaluation