Practice Lifting Capacity and Operating Radius - 3.2 | 14. Productivity of Shovel | Construction Engineering & Management - Vol 2
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What is the angle of swing?

💡 Hint: Think about the horizontal swing of the excavator's bucket.

Question 2

Easy

Define cycle time.

💡 Hint: Consider how long it takes for the excavator to complete its task.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What effect does a swing angle greater than 90 degrees have on cycle time?

  • Increases cycle time
  • Decreases cycle time
  • No effect

💡 Hint: Consider how distance affects travel time.

Question 2

True or False: The ideally positioned truck adds no correction factor to productivity calculations.

  • True
  • False

💡 Hint: What is the ideal condition to remember?

Solve and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

If the ideal swing angle is maintained at 70 degrees while the height of cut is 3 meters and optimal height is 5 meters, determine the correction factor based on hypothetical values from a provided chart.

💡 Hint: Check the values provided in the textbook or table for specifics.

Question 2

A shovel operates with a heaped bucket volume of 4 cubic meters and takes 30 seconds per cycle. If it works efficiently for 50 minutes, calculate its potential output using the given formula and considering an efficiency percentage.

💡 Hint: Remember to adjust the figure for the time worked effectively.

Challenge and get performance evaluation