Outline of Today’s Presentation

2 - Outline of Today’s Presentation

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions

Question 1 Easy

What is the primary purpose of a crane?

💡 Hint: Think of what cranes do at construction sites.

Question 2 Easy

Name one type of crane motion.

💡 Hint: It refers to lifting or lowering loads.

4 more questions available

Interactive Quizzes

Quick quizzes to reinforce your learning

Question 1

What is the primary mechanism that allows a crane to lift loads?

Hydraulic System
Pulleys and Ropes
Electric Motor

💡 Hint: Consider the components talked about in lifting.

Question 2

Is hoisting the act of lifting loads?

True
False

💡 Hint: What does hoisting mean in crane terms?

2 more questions available

Challenge Problems

Push your limits with advanced challenges

Challenge 1 Hard

A mobile crane has a load of 2000 kg, a boom weighing 500 kg, and a wind load of 100 kg. Calculate the factors needed to determine the safe working load.

💡 Hint: Consider the tipping moment versus stability.

Challenge 2 Hard

Explain how changing the boom angle affects the operational stability and lifting capacity.

💡 Hint: Draw a diagram to visualize angle changes.