Practice Outline of Today’s Presentation - 2 | 3. Construction Methods and Equipment Management | Construction Engineering & Management - Vol 3
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What is the primary purpose of a crane?

💡 Hint: Think of what cranes do at construction sites.

Question 2

Easy

Name one type of crane motion.

💡 Hint: It refers to lifting or lowering loads.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is the primary mechanism that allows a crane to lift loads?

  • Hydraulic System
  • Pulleys and Ropes
  • Electric Motor

💡 Hint: Consider the components talked about in lifting.

Question 2

Is hoisting the act of lifting loads?

  • True
  • False

💡 Hint: What does hoisting mean in crane terms?

Solve 2 more questions and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

A mobile crane has a load of 2000 kg, a boom weighing 500 kg, and a wind load of 100 kg. Calculate the factors needed to determine the safe working load.

💡 Hint: Consider the tipping moment versus stability.

Question 2

Explain how changing the boom angle affects the operational stability and lifting capacity.

💡 Hint: Draw a diagram to visualize angle changes.

Challenge and get performance evaluation