Practice Guidelines for Finishing - 1.4 | 13. Finishing Machines | Construction Engineering & Management - Vol 3
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What is a power float?

💡 Hint: Think about the name and its function.

Question 2

Easy

How many square meters can a power float finish in a day?

💡 Hint: Compare it to manual finishing productivity.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is the primary advantage of using a power float?

  • Lower cost
  • Higher productivity
  • More manual control

💡 Hint: Consider efficiency in construction.

Question 2

Troweling requires blades to be angled, true or false?

  • True
  • False

💡 Hint: Remember how each technique functions.

Solve and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

A construction project requires finishing a 1000 square meter concrete slab. If manual methods can finish 50 square meters per day, how many days will it take? How would productivity change if a power float is used instead?

💡 Hint: Compare the rates and divide the total area by the finishing capability.

Question 2

If the concrete's surface leaves a footprint greater than 6 mm when tested, what does that indicate about its readiness for machine finishing?

💡 Hint: Reflect on the criteria you learned about ready-to-finish concrete.

Challenge and get performance evaluation