1.5 - Wind Load Considerations
Enroll to start learning
You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.
Practice Questions
Test your understanding with targeted questions
What is the primary purpose of outriggers?
💡 Hint: Think about what helps keep the crane upright.
What does OSHA stand for?
💡 Hint: What organization sets workplace safety regulations?
4 more questions available
Interactive Quizzes
Quick quizzes to reinforce your learning
What should be done if wind speeds exceed 72 km/h?
💡 Hint: Remember the specific wind speed mentioned in the section.
True or False: Properly extending outriggers can reduce crane-related accidents.
💡 Hint: Think about how stability affects crane operation.
Get performance evaluation
Challenge Problems
Push your limits with advanced challenges
A crane needs to lift a load weighing 1000 kg to a height of 50 meters while the wind speed is currently at 80 km/h. What should the operator do?
💡 Hint: Recall the safety regulations regarding crane operations in high winds.
Using a crane range diagram, determine the boom length required to lift a load 60 meters vertically while extending 30 meters horizontally. What factors must the operator also consider?
💡 Hint: Think about how to interpret the diagram and additional factors affecting crane operation.
Get performance evaluation
Reference links
Supplementary resources to enhance your learning experience.