Practice Break Pressure Tanks - 2.1.3 | Building Plumbing | Environmental Engineering
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

2.1.3 - Break Pressure Tanks

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What is the primary function of break pressure tanks?

💡 Hint: Think about how water pressure changes in different parts of a tall building.

Question 2

Easy

Why is it important to maintain break pressure tanks?

💡 Hint: What happens if you ignore regular checks?

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is the main benefit of using break pressure tanks in high-rise buildings?

  • A) To increase water temperature
  • B) To reduce excessive pressure
  • C) To store waste water

💡 Hint: Think about why pressure becomes a problem in tall buildings.

Question 2

True or False: Break pressure tanks are used to increase water flow to the upper floors.

  • True
  • False

💡 Hint: Focus on the main function of the tanks we just discussed.

Solve and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

Assess the potential impact on a building's plumbing if break pressure tanks were omitted from the design. What issues might arise?

💡 Hint: Think about how pressure changes in buildings and the need for balance.

Question 2

Propose a troubleshooting plan for a malfunctioning break pressure tank in a 15-story building.

💡 Hint: Consider what conditions might lead to malfunction in these systems.

Challenge and get performance evaluation