Enrol to start learning
Reading is open to everyone. Enrolling is free, and it is what unlocks the audio lessons, practice tests and progress tracking.
16.7.2. Economics and Construction Costs
This section
Practice test
11 questions on this section. Wrong answers show you what to read again.
Sign up to take itWhole chapter
Revision test
Mixed questions from across the chapter. Your answers get marked.
Sign up to take itQuick
Flashcard drill
3 cards from this lesson. Good the night before a test.
Try these first
- 1.
Define Open Channel Flow.
Hint
Think about gravity-driven flows.
- 2.
What happens in a hydraulic jump?
Hint
Consider changes in flow characteristics.
- 3.
What drives open channel flow?
- Pressure
- Gravity
- Centrifugal Force
Hint
Think about natural flow conditions.
- 4.
True or False: A hydraulic jump results in energy gain for the system.
- True
- False
Hint
Consider the impact on energy during transitions.
- 5.
Design an Open Channel for an irrigation system aimed to minimize construction costs while ensuring adequate flow. What shape would you use and why?
Hint
Reflect on optimal designs discussed in class.
- 6.
Given a hydraulic radius of 2 meters and a channel width of 4 meters, calculate the wetted perimeter and then suggest adjustments that could improve flow efficiency.
Hint
Utilize the formula we discussed.
Exercises
Total Questions
2
Estimated Time
4 min
Passing Score
70%
Instructions
- Read each question carefully
- You can use hints if you need help
- Complete all questions before submitting
4 more questions available
Enrol freeQuiz
Total Questions
2
Estimated Time
4 min
Passing Score
70%
Instructions
- Read each question carefully
- You can use hints if you need help
- Complete all questions before submitting
1 more question available
Enrol freeChallenge Problems
Total Questions
2
Estimated Time
4 min
Passing Score
70%
Instructions
- Read each question carefully
- You can use hints if you need help
- Complete all questions before submitting