Practice Elastic Settlement or Immediate Settlement - 1.3 | 1. CONSOLIDATION | Geotechnical Engineering - Vol 2
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

1.3 - Elastic Settlement or Immediate Settlement

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What is elastic settlement?

💡 Hint: Consider the immediate effect of a load on soil.

Question 2

Easy

Name the components of total settlement.

💡 Hint: Recall the formula St = Si + Sc + Ssc.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What happens during elastic settlement?

  • Water is expelled
  • Soil distorts at constant volume
  • Secondary consolidation begins

💡 Hint: Think about what happens immediately after a load is applied.

Question 2

True or False: Elastic settlement differs from primary and secondary settlements in that it occurs independently of time.

  • True
  • False

💡 Hint: Consider how quickly each type of settlement occurs.

Solve and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

A new building is constructed on a soil type determined to have a high compressibility. Describe how elastic settlement will influence its design and potential risks associated.

💡 Hint: Think about how compressible soils interact with structures.

Question 2

Illustrate a case where delaying load application on saturated clay soil minimizes elastic settlement. What would structural engineers need to consider?

💡 Hint: Focus on the interaction between water and soil structure.

Challenge and get performance evaluation