Practice NTPC Simhadri Floating Solar Project - 18.6.3 | 18. Introduction | Hydrology & Water Resources Engineering - Vol 2
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

18.6.3 - NTPC Simhadri Floating Solar Project

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What is the capacity of the NTPC Simhadri Floating Solar Project?

💡 Hint: Look for the specific capacity mentioned in the section.

Question 2

Easy

Name one benefit of floating solar projects.

💡 Hint: Think about the main aims of such projects.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is the capacity of the NTPC Simhadri Floating Solar Project?

  • 20 MW
  • 25 MW
  • 30 MW

💡 Hint: Look for numbers related to energy capacity.

Question 2

True or False: The NTPC Simhadri project is solely focused on electricity generation.

  • True
  • False

💡 Hint: Consider the dual purpose of floating solar projects.

Solve 1 more question and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

Consider a model of the NTPC Simhadri floating solar project. Calculate the percentage reduction in evaporation if the panels decrease evaporation by 30% compared to a standard reservoir scenario. Discuss the implications this reduction has on water resource management.

💡 Hint: Think about how to convert percentages into actual water quantities.

Question 2

Evaluate the long-term economic benefits versus initial installation costs of a floating solar project like NTPC Simhadri. Create a simple cost-benefit analysis framework.

💡 Hint: Begin by listing all fixed and variable costs alongside potential revenue.

Challenge and get performance evaluation