Timing and Supervision

5.3 - Timing and Supervision

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions

Question 1 Easy

What is slump loss?

💡 Hint: Think about what happens to wet concrete after some time.

Question 2 Easy

What is the role of a supervisor in concrete placement?

💡 Hint: Consider who needs to oversee many workers.

4 more questions available

Interactive Quizzes

Quick quizzes to reinforce your learning

Question 1

What time frame should concrete ideally be placed after mixing?

30-45 minutes
15-20 minutes
1 hour

💡 Hint: Think about what's necessary for fresh concrete.

Question 2

Supervisors should monitor what conditions during concrete placement?

True
False

💡 Hint: What keeps the concrete usable?

1 more question available

Challenge Problems

Push your limits with advanced challenges

Challenge 1 Hard

A construction site experiences an unexpected delay in transportation, causing the concrete to sit for 50 minutes before placement. Describe the potential issues that might arise and the possible corrective actions.

💡 Hint: Where does the time factor come in?

Challenge 2 Hard

During a site visit, a supervisor discovers the ambient temperature is above 35°C. What steps should they take to maintain concrete quality?

💡 Hint: How does temperature play into concrete setting?