3.2 - Typical Timeline
Enroll to start learning
You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.
Practice Questions
Test your understanding with targeted questions
What is slump loss?
💡 Hint: Think about what happens to concrete after mixing.
Name one cause of slump loss.
💡 Hint: Consider conditions that could make concrete set faster.
4 more questions available
Interactive Quizzes
Quick quizzes to reinforce your learning
What is slump loss?
💡 Hint: Consider what happens to the concrete's ease of handling.
High temperatures can accelerate slump loss.
💡 Hint: Think about how heat impacts reactions in concrete.
1 more question available
Challenge Problems
Push your limits with advanced challenges
A construction team mixed concrete but didn't place it until after 75 minutes in a 35°C environment. What potential issues may arise, and how could this have been prevented?
💡 Hint: Think about both environmental conditions and planned timing.
Design a strategy for pouring concrete on a hot summer day to mitigate slump loss. Include considerations for materials, timing, and techniques.
💡 Hint: Consider the logistics of temperature control in your plan.
Get performance evaluation