Typical Timeline

3.2 - Typical Timeline

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions

Question 1 Easy

What is slump loss?

💡 Hint: Think about what happens to concrete after mixing.

Question 2 Easy

Name one cause of slump loss.

💡 Hint: Consider conditions that could make concrete set faster.

4 more questions available

Interactive Quizzes

Quick quizzes to reinforce your learning

Question 1

What is slump loss?

Loss of water
Reduction in workability
Increase in temperature

💡 Hint: Consider what happens to the concrete's ease of handling.

Question 2

High temperatures can accelerate slump loss.

True
False

💡 Hint: Think about how heat impacts reactions in concrete.

1 more question available

Challenge Problems

Push your limits with advanced challenges

Challenge 1 Hard

A construction team mixed concrete but didn't place it until after 75 minutes in a 35°C environment. What potential issues may arise, and how could this have been prevented?

💡 Hint: Think about both environmental conditions and planned timing.

Challenge 2 Hard

Design a strategy for pouring concrete on a hot summer day to mitigate slump loss. Include considerations for materials, timing, and techniques.

💡 Hint: Consider the logistics of temperature control in your plan.