4.4.1 - Surface Preparation
Enroll to start learning
You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.
Practice Questions
Test your understanding with targeted questions
What is surface preparation?
💡 Hint: Think about what steps need to be taken before plastering.
Why should the surface be moistened before plastering?
💡 Hint: Consider how water interacts with the plaster.
4 more questions available
Interactive Quizzes
Quick quizzes to reinforce your learning
What is the primary purpose of surface preparation in plastering?
💡 Hint: Think about the outcomes of good versus poor adhesion.
True or False: Moistening the surface before plastering is optional.
💡 Hint: Consider the role of water in the curing process.
Get performance evaluation
Challenge Problems
Push your limits with advanced challenges
In a construction scenario, surface preparation was ignored due to time constraints. Discuss the potential long-term effects on the plaster and the building's structural integrity.
💡 Hint: Reflect on how important adhesion is for plaster durability.
You are tasked with preparing a surface for a high-end plaster application. What steps will you take to ensure adherence and what factors will you consider regarding moisture levels?
💡 Hint: Think about optimal conditions for plaster curing.
Get performance evaluation
Reference links
Supplementary resources to enhance your learning experience.