Practice Case Studies of High Performance Concrete Usage - 7.10 | 7. High Performance Concrete | Concrete Technology
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

7.10 - Case Studies of High Performance Concrete Usage

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What is one reason for using HPC in the Bandra-Worli Sea Link?

💡 Hint: Think about the environment where the sea link is located.

Question 2

Easy

Name one material that was used in the HPC mix for the Burj Khalifa.

💡 Hint: Consider materials that improve strength.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

Why was high performance concrete used in the Bandra-Worli Sea Link?

  • A) To increase weight
  • B) To reduce permeability
  • C) To enhance chloride resistance

💡 Hint: Think of the materials found near the coast.

Question 2

The Burj Khalifa utilized HPC for which reason?

  • True
  • False

💡 Hint: Consider the height challenges in that construction.

Solve and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

Evaluate the implications of GGBS usage in coastal constructions in terms of both performance and environmental impact.

💡 Hint: Think about environmental benefits along with performance.

Question 2

Create a comparison table detailing the advantages and disadvantages of using HPC vs traditional concrete for large-scale projects.

💡 Hint: Consider practical and economic factors.

Challenge and get performance evaluation