Practice Consumable Cost Estimation (5.5) - Construction Methods and Equipment Management
Students

Academic Programs

AI-powered learning for grades 8-12, aligned with major curricula

Professional

Professional Courses

Industry-relevant training in Business, Technology, and Design

Games

Interactive Games

Fun games to boost memory, math, typing, and English skills

Consumable Cost Estimation

Practice - Consumable Cost Estimation

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions

Question 1 Easy

What are the key components of operating costs?

💡 Hint: Think about what costs are variable.

Question 2 Easy

Name a type of repair that is considered under ownership costs.

💡 Hint: Focus on repairs requiring significant investment.

4 more questions available

Interactive Quizzes

Quick quizzes to reinforce your learning

Question 1

What is not considered an operating cost?

Fuel
Wages
Major repairs
Lubricants

💡 Hint: Major costs are typically fixed.

Question 2

True or False: Ownership costs are variable and depend on usage.

True
False

💡 Hint: Think about the nature of ownership costs.

Get performance evaluation

Challenge Problems

Push your limits with advanced challenges

Challenge 1 Hard

Calculate the total consumable cost for a project where an excavator is used 300 hours in a month, consuming fuel at a rate of 15 liters per hour, with fuel priced at $1.50/liter.

💡 Hint: First, calculate the total fuel consumption then do the multiplication with cost per liter.

Challenge 2 Hard

Develop a comprehensive plan outlining steps to estimate labor costs for an upcoming project with varied working conditions.

💡 Hint: Consider how different conditions might affect labor needs.

Get performance evaluation

Reference links

Supplementary resources to enhance your learning experience.