Practice Working on an Illustration - 9.1 | 15. Equipment Life and Replacement Analysis (Part-1) | Construction Engineering & Management - Vol 1
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What is the first phase in the equipment life cycle?

💡 Hint: It begins with acquiring the machine.

Question 2

Easy

Define downtime in the context of equipment.

💡 Hint: Consider repairs or maintenance when answering.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What does economic useful life refer to?

  • The time period before a machine fails
  • The period of minimum costs or maximum profits
  • The age of the machine

💡 Hint: Think about both cost and profits in terms of timing.

Question 2

True or False: Downtime refers to the time when machinery is under maintenance.

  • True
  • False

💡 Hint: Consider machinery's operational status.

Solve 1 more question and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

Imagine you have two machines: Machine A with minimal repair costs for the next two years and Machine B with increasing costs. How do you decide when to replace?

💡 Hint: Review cost trends and project future expenses.

Question 2

A machine was purchased 5 years ago for $50,000. Its operational cost is rising by 10% annually. Calculate the future value of this machine after another 5 years considering inflation.

💡 Hint: Include the compounding effect in your calculations.

Challenge and get performance evaluation