Practice Turn Time - 1.6 | 7. Cycle Time of a Scraper | Construction Engineering & Management - Vol 2
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What are the two main components that divide cycle time?

💡 Hint: Think about what components remain constant and which ones change.

Question 2

Easy

How long is the average loading time for common earth?

💡 Hint: Consider common values stated for normal earth loading.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What formula represents the cycle time for scrapers?

  • Cycle Time = LT + HT + DT + RT + ST + TT + ADBT
  • Cycle Time = LT + HT - DT - RT
  • Cycle Time = LT x HT x DT

💡 Hint: Remember the components we've discussed!

Question 2

True or False: Loading a scraper to its maximum capacity always enhances its efficiency.

  • True
  • False

💡 Hint: Think about how resistance plays a role when too much material is present.

Solve 1 more question and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

You are analyzing a construction site with a total distance of 400 meters for haul and a machine speed of 20 meters/minute. Calculate the haul time. If the machine faces an unexpected incline which reduces its speed by half, recalculate the new haul time.

💡 Hint: Use speed = distance/time.

Question 2

If a scraper has a loading time of 0.6 minutes, dump time of 0.5 minutes, and turning time of 0.25 minutes, how much time would it take for 4 complete cycles assuming the haul time remains constant at 3 minutes?

💡 Hint: Remember to add each component of the cycle for calculating the overall cycle time.

Challenge and get performance evaluation