Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.
Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.
Enroll to start learning
You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.
Listen to a student-teacher conversation explaining the topic in a relatable way.
Today, we'll begin with understanding the different states of volume. Can anyone tell me what we mean by 'bank volume'?
Isn't it the volume of the soil in its natural state?
Exactly! Bank volume is the volume before any excavation occurs. Now, what about 'loose volume'?
That's after excavation, right? The material is all disturbed.
Great! So we have two definitions: bank volume and loose volume. Remember these as they are vital for productivity calculations. What’s the last type? Any thoughts?
Uh, it’s the compacted volume?
Correct! Compact volume is the density of the material after being compacted. Knowing these terms will help you in your calculations moving forward.
To help remember: think of it as BLC - Bank, Loose, Compacted. Bank Volume is before work, Loose Volume is after, and Compacted is after packing.
Always think BLC to easily recall them.
Now that we've covered the definitions, how do you think these affect the productivity of machines like bulldozers?
If we calculate the loose volume inaccurately, our productivity estimates will also be wrong.
Exactly. If you underestimate loose volume, you might believe you're moving faster than you are.
So, does it mean that knowing how much material there is in both the bank and loose states can change operational strategies?
Spot on! Measuring these states impacts your entire project planning, especially cost estimates. Can anyone explain why having accurate measurements might reduce costs?
If you know the right volume, you can estimate labor and machinery needs more accurately.
Right! Expanding on this: if your calculations are off, it can lead to either overbidding or project delays.
Remember this: accuracy in measurements leads to efficiency and cost-effectiveness.
In real-life projects, how do machines use these volume definitions in operation?
They use it to plan the cycle times, like calculating how long a bulldozer will take per load.
Correct! A bulldozer's effectiveness comes from understanding these volumes. Can anyone explain what happens if the cycle time calculation is off?
If cycle times are underestimated, it can lead to expecting the bulldozer to finish work way too quickly?
Exactly! This misunderstanding can lead to missed deadlines and increased costs. How can we improve estimates for cycle times?
By taking accurate measurements of the dozing distance and knowing the density of the material.
Good! Remember: measuring, calculating, and understanding can lead to success. The volume definitions are vital tools in your toolbox.
Read a summary of the section's main ideas. Choose from Basic, Medium, or Detailed.
The section emphasizes that the measurement of volume can vary depending on the condition of the material, such as loose, bank, or compacted states. It highlights how these definitions affect productivity estimates and operational efficiency, especially in earthmoving applications.
In construction and earthmoving operations, defining the volume of material accurately is crucial. This section explores different states of material volume, specifically focusing on loose volume, bank volume, and compacted volume. It explains that loose volume refers to the volume of loose material after excavation, while bank volume is the natural volume of material prior to any disturbance, and compacted volume is the volume of material after it has been compacted. Properly identifying these states allows for accurate productivity calculations which directly influence operational efficiency and cost estimation. Additionally, the section ties the definitions back to practical implications in machinery operations, such as bulldozer productivity, cycle times, and project efficiency.
Dive deep into the subject with an immersive audiobook experience.
Signup and Enroll to the course for listening the Audio Book
Whenever you express the volume, you should be very specific that whether you are expressing the volume in the loosen state or bank state, that is natural state or in the compacted state.
Volume can be measured in different states of material. The loosen state refers to the condition when the material has been disturbed and is not compacted, while the bank state refers to its natural, undisturbed condition. It's important to specify which state you are referring to when discussing volume, as it can have significant implications for calculations in earth moving and excavation projects.
Think of a bag of popcorn. When you first pop the corn, it expands and becomes airy and fluffy. This is similar to the 'loosen state'. But if you were to press that popcorn down into a flat bag, it would become denser and more compacted—this would represent the 'bank state'. Knowing which state you're measuring helps determine how much material you really have.
Signup and Enroll to the course for listening the Audio Book
The production here is expressed in loose meter cube per hour, that means you have cut the earth and loosen the material after loosening in it, what is the productivity.
Productivity in earth moving operations is often measured in loose meter cubes per hour. This metric reflects the amount of earth that has been cut, loosened, and is ready to be moved within an hour. To calculate this value, you typically take the blade load (the amount of material the bulldozer can push) and divide it by the total cycle time (the time it takes to complete the push, return, and maneuver).
Imagine a worker loading boxes onto a truck. If he can load 100 boxes in an hour, his productivity is 100 boxes per hour. If you disrupted his flow, taking a moment to reposition or adjust would reduce the number of boxes he loads. Similarly, bulldozers have cycle times affected by several factors that determine how much earth they can move.
Signup and Enroll to the course for listening the Audio Book
It is nothing but your blade load divided by the cycle time. So, how to determine the blade load just now we discussed.
To estimate productivity accurately, you must know both the blade load and the cycle time. Blade load can be assessed from the manufacturer's specifications or prior experience. Cycle time is made up of variable times like the push and return times, and fixed time, which includes maneuvering time. The cycle time is crucial as it indicates how long it takes to push material, return to the starting point, and make necessary adjustments.
Consider an assembly line in a factory. If a worker can only assemble 5 toys in 10 minutes but needs to stop for 2 minutes to fetch more parts, their productivity decreases. If they could assemble 5 toys with no breaks, that would maximize their productivity, similar to how measuring cycle time can help determine the bulldozer's productivity.
Signup and Enroll to the course for listening the Audio Book
You should know that your machine is not going to be operated for the entire 60 minutes in an hour.
In real-world scenarios, a bulldozer will often not be operational for a full hour due to various interruptions—such as waiting for the loading of material or machinery downtime. This translates to a concept called job efficiency or working efficiency, which is the actual productive time the vehicle spends working versus the total time available. This efficiency must be calculated to obtain realistic productivity metrics.
Think of a student studying for an hour. If they spend 45 minutes actively studying and 15 minutes distracted by their phone, their efficiency is only 75%. Understanding and applying this concept in construction work can lead to more accurate project estimates.
Signup and Enroll to the course for listening the Audio Book
The unit cost is nothing but cost per loose meter cube. Say I am going to find it in the loosen state cost per meter cube of earth moved.
To estimate the cost of moving earth in construction projects, you take the total hourly operating cost of the bulldozer and divide it by its productivity in loose meter cubes per hour. This gives a cost per unit of earth moved, which is critical in bidding and project management as it helps determine project feasibility and financial planning.
Think of running a restaurant. If you spend $100 an hour to keep the restaurant open and you serve 20 meals, your cost per meal is $5. Similarly, knowing how much it costs to move a meter cube of earth can help construction managers avoid financial pitfalls.
Signup and Enroll to the course for listening the Audio Book
These production curves will have a relationship between the dozing distance and the production.
Production curves are graphs that illustrate the relationship between dozing distance (how far the bulldozer moves material) and the productivity rates. Manufacturers provide these curves to estimate how efficiently a bulldozer can work under standard conditions. However, real conditions often differ—therefore, correction factors based on site-specific challenges (like slope or soil type) must be applied to adjust the expected productivity from the curves.
Consider a professional athlete's performance. A standard training manual might show expected performance under ideal conditions (good weather, no injuries). However, a real athlete may need to consider injuries, slippery fields, or time constraints. Just as athletes must adapt their practices based on actual conditions, engineers must adjust expected productivity based on real-world factors.
Learn essential terms and foundational ideas that form the basis of the topic.
Key Concepts
Volume Definitions: Understanding bank, loose, and compacted volumes is crucial for accurate productivity calculations.
Impact on Productivity: Accurate volume calculations are essential for efficient project planning and cost estimation.
Cycle Time Importance: Knowledge of cycle time, dependent on volume definitions, impacts bulldozer operation efficiency.
See how the concepts apply in real-world scenarios to understand their practical implications.
Calculating the loose volume from bank volume when the swell factor is known.
Estimating project costs by utilizing accurate measurements of different volume states.
Use mnemonics, acronyms, or visual cues to help remember key information more easily.
Bank before the dig, Loose follows the jig, Pack it down right, Compacted is tight.
A construction site begins with workers discussing bank volume. They then dig and shout, 'Look at the loose material!' Finally, they compact the earth into a strong layer, discussing how each state is essential for efficient work.
Remember BLC: Bank-Lose-Compact to recall the three states of material.
Review key concepts with flashcards.
Review the Definitions for terms.
Term: Bank Volume
Definition:
The natural volume of earth material before excavation.
Term: Loose Volume
Definition:
The volume of earth material after it has been excavated and disturbed.
Term: Compacted Volume
Definition:
The volume of earth material after it has been compacted, reducing air space.
Term: Cycle Time
Definition:
The total time taken for a complete operational cycle of a bulldozer, including cutting, pushing, and returning.
Term: Dozing Distance
Definition:
The distance over which material is pushed by the bulldozer.