Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.
Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.
Enroll to start learning
You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.
Test your understanding with targeted questions related to the topic.
Question 1
Easy
What is the formula for calculating loading time?
💡 Hint: Think about how we measure time in operations.
Question 2
Easy
Define gravimetric capacity.
💡 Hint: What does the manufacturer specify?
Practice 4 more questions and get performance evaluation
Engage in quick quizzes to reinforce what you've learned and check your comprehension.
Question 1
What is the maximum percentage of additional weight a machine can carry based on its gravimetric capacity?
💡 Hint: Remember, exceeding capacity can damage machinery.
Question 2
True or False: The average dump time is the same for all materials regardless of their type.
💡 Hint: Consider how different materials behave.
Solve and get performance evaluation
Push your limits with challenges.
Question 1
If a truck transports 10.3 m³ of material and a loader bucket has a capacity of 2.2 m³ with a fill factor of 90%, how many truckloads are equivalent to a bucket full?
💡 Hint: Use the formula wisely and don’t forget the fill factor.
Question 2
Given a situation where you can either choose 7 or 8 trucks for an excavator. If the balance number is calculated as 7.4, which does an economic analysis suggest is better?
💡 Hint: Analyze costs and potential idle times.
Challenge and get performance evaluation