Calculating Truck Cycle Time

5.2 - Calculating Truck Cycle Time

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions

Question 1 Easy

Define gravimetric capacity in your own words.

💡 Hint: Think about safety and manufacturer guidelines.

Question 2 Easy

How is loading time calculated?

💡 Hint: Refer to the multiplication of two factors.

4 more questions available

Interactive Quizzes

Quick quizzes to reinforce your learning

Question 1

What does the gravimetric capacity of a machine refer to?

The total weight capacity
The weight capacity as defined by the manufacturer
The speed of the machine

💡 Hint: Think about safety limits and guidelines provided by manufacturers.

Question 2

True or False: Overloading a truck can lead to severe operational costs in terms of tire wear and machine integrity.

True
False

💡 Hint: Consider what happens when machines are beyond their load limits.

Get performance evaluation

Challenge Problems

Push your limits with advanced challenges

Challenge 1 Hard

A truck can handle a gravimetric capacity of 25 tons. If wet sand, weighing 2.5 tons/m³, is used, calculate how much volume can the truck carry. What would the cycle time be if the loading takes 7 minutes and dumping takes another 3 minutes?

💡 Hint: Break down the problem into weight and load capacity first.

Challenge 2 Hard

Given a truck with a loading time of 6 minutes and a cycle time of 30 minutes (including haul and return), what is the expected hourly production assuming 50 minutes of effective operational time?

💡 Hint: Focus on unit rates to finalize the productivity value.