Practice Dismantling Procedure - 2.4 | 6. Types of Jib Cranes | Construction Engineering & Management - Vol 3
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What is the first component to remove when dismantling a crane?

💡 Hint: Think about what supports the movement of the crane.

Question 2

Easy

Why are counterweights necessary during crane operations?

💡 Hint: Consider what would happen if a crane was unbalanced.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is the maximum height for free-standing tower cranes without additional support?

  • 50 meters
  • 60-120 meters
  • 300 meters

💡 Hint: Think about how cranes are classified based on height capabilities.

Question 2

True or False: A climbing cage reduces the need for a mobile crane during the entire dismantling process.

  • True
  • False

💡 Hint: Consider the functions of the climbing cage during crane operations.

Solve 2 more questions and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

Given a scenario of a crane being dismantled at 250 meters height, outline the safety protocol and necessary equipment required.

💡 Hint: Think about what goes into supporting a structure from the ground up.

Question 2

Imagine you are leading a dismantling project for a crane taller than 300 meters. What innovative methods would you employ to dismantle the crane safely?

💡 Hint: What solutions have we seen for large-scale dismantling before?

Challenge and get performance evaluation