Self-Erection Procedure - 2.3 | 6. Types of Jib Cranes | Construction Engineering & Management - Vol 3
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

Interactive Audio Lesson

Listen to a student-teacher conversation explaining the topic in a relatable way.

Foundation Preparation

Unlock Audio Lesson

0:00
Teacher
Teacher

Let's begin with the foundation preparation. Why is a heavy foundation critical for a tower crane?

Student 1
Student 1

It needs to be stable and support the crane's weight, right?

Teacher
Teacher

Exactly! A strong foundation with heavy reinforcements ensures stability. What happens if the foundation is weak?

Student 2
Student 2

The crane could topple or fail during operation.

Teacher
Teacher

Correct! Remember, stability is the SAINT rule - Stability, Adequacy, Integrity, Necessary Time. Now, how many tower sections do we secure to the foundation initially?

Student 3
Student 3

Only the first few sections, right?

Teacher
Teacher

Yes, that's right! For our cranes, we start with just a few sections built securely.

Teacher
Teacher

To summarize, a robust foundation is crucial for stability, and we begin by securing the initial sections of the tower.

Using a Mobile Crane

Unlock Audio Lesson

0:00
Teacher
Teacher

Now, let’s talk about the mobile crane’s role. How does it assist in erecting the tower crane structure?

Student 4
Student 4

It places the turntable and climbing cage, right?

Teacher
Teacher

Absolutely! The mobile crane provides essential support at the start. Can anyone tell me what comes next after securing the climbing cage?

Student 1
Student 1

Adding counterweights and the counter jib!

Teacher
Teacher

Exactly! This setup helps balance the crane before we perform the self-erection. Can anyone remind me why balance is crucial in crane operations?

Student 2
Student 2

To prevent tipping or instability during lifting!

Teacher
Teacher

Great points! Let’s summarize: The mobile crane's job is vital for initial assembly, especially placing the turntable and climbing cage, followed by balancing with counterweights.

Self-Erection Process

Unlock Audio Lesson

0:00
Teacher
Teacher

Let’s dive into the self-erection process now. What primary action do we perform to add height to the tower?

Student 3
Student 3

We use the trolley action to bring a new section closer!

Teacher
Teacher

Correct! The trolley moves the new section into position. What comes next after that?

Student 4
Student 4

We unbolt the turntable and use the hydraulic jack to lift it!

Teacher
Teacher

Yes! Lifting the turntable creates space for the new section. Why is it essential to bolt the new section properly?

Student 1
Student 1

To ensure it’s connected securely, so it doesn’t fall during operation.

Teacher
Teacher

Exactly! Reinforcing the new section with bolts is vital for safety. Let’s recap: the self-erection involves trolleying, unbolting, lifting, and securing.

Dismantling Process

Unlock Audio Lesson

0:00
Teacher
Teacher

Now, how do we dismantle the tower crane using the climbing cage?

Student 2
Student 2

We can do it in reverse order of how we put it up!

Teacher
Teacher

Exactly! First, we remove the jib, then counterweights, and so on. What’s a critical consideration during dismantling?

Student 3
Student 3

We need a mobile crane if there's no climbing cage, right?

Teacher
Teacher

Absolutely! It’s essential for stability. How do we ensure safety when removing high components?

Student 4
Student 4

We should follow proper procedures and make sure both the crane and workers are safe.

Teacher
Teacher

Great insights! To summarize: dismantling is reversing the erection steps, and safety remains paramount.

Introduction & Overview

Read a summary of the section's main ideas. Choose from Basic, Medium, or Detailed.

Quick Overview

This section outlines the self-erection procedure of articulated jib tower cranes, focusing on the setup using a climbing cage.

Standard

In this section, we explore the self-erection process of articulated jib tower cranes utilizing a climbing cage, detailing the steps from foundation preparation to height adjustment. Key processes include the use of a mobile crane for initial assembly and the subsequent autonomous height increase using hydraulic systems.

Detailed

Self-Erection Procedure of Tower Cranes

This section elaborates on the self-erection procedure utilized by articulated jib tower cranes, emphasizing the role of the ambitious climbing cage mechanism. Initially, a robust foundation must be constructed to accommodate the section of the tower crane. This foundation is reinforced to handle the structure's weight and dynamic forces. Following the foundation work, a mobile crane assists in placing the turntable, climbing cage, and operator cap atop the initial tower sections.

Once the basic framework is stabilized, the counter jib and counterweights are added to balance the crane's operations. The remarkable advantage of the climbing cage comes into play, allowing subsequent tower height increases without the need for a mobile crane. This is achieved through a meticulous process involving trolley action to bring new sections closer, followed by unbolting the turntable to make room for the new section, which is then bolted securely. This self-erection method enhances efficiency, minimizing resource dependency and time investments.

Additionally, the section discusses dismantling procedures, emphasizing that the process can easily be reversed using the climbing cage system, and mentions the importance of structural stability and height limitations for cranes.

Audio Book

Dive deep into the subject with an immersive audiobook experience.

Preparation for Erection

Unlock Audio Book

Signup and Enroll to the course for listening the Audio Book

Now, let us see how the erection of the tower crane is done with climbing cage. In modern tower cranes, we have this climbing cage facility which facilitates the self erection process of the crane. So, basically, what you have to do is first, you have to prepare the foundation for the tower crane that is very important. You have to prepare a heavy foundation for the tower crane according to the requirement, put heavy reinforcement and then both the tower sections to the foundation after construction of the first few sections of the tower crane.

Detailed Explanation

The first step in the self-erection procedure for tower cranes is to prepare a suitable foundation. This foundation must be heavy and fortified (reinforced) to support the weight of the crane and the loads it will lift. After constructing this strong base, the initial sections of the tower crane are securely attached to this foundation, ensuring stability while the crane is erected.

Examples & Analogies

Imagine building a tall bookshelf; before placing it up, you first need to make sure it has a strong base. Just like you wouldn't put a heavy bookshelf on a flimsy table, a tower crane needs a robust foundation to keep it from tipping over.

Erecting the Tower Sections

Unlock Audio Book

Signup and Enroll to the course for listening the Audio Book

Now, what you do is, you erect your turntable or this slewing ring, operator cap and the tower top. For all these things, we need the support of another mobile crane. With the help of another mobile crane, you erect the turntable, climbing cage, this is your climbing cage, climbing cage with the hydraulic jack system. You will be seeing a hydraulic cylinder here which helps the lifting.

Detailed Explanation

After the foundation is prepared, the next step involves lifting various components of the tower crane such as the turntable, operator cap, and tower top. This requires a second mobile crane to provide the necessary lifting power. The climbing cage, which is a key component of the self-erection process, includes a hydraulic jack system that allows for better maneuverability and control when lifting these heavy parts into place.

Examples & Analogies

Think of lifting a heavy lid onto a storage box. Instead of trying to lift it directly with one hand, you might ask a friend to help lift it at the same time, which makes the job much easier. Here, the second crane acts like that friend, helping to position the heavy parts into place.

Adding Counterweights and Jib Portions

Unlock Audio Book

Signup and Enroll to the course for listening the Audio Book

And the tower top, you erect it. Then now, you put the counter jib with few counterweights. First, you put few counterweights, then slowly increase the jib portion. As you increase the jib portion sections, you can increase the number of blocks here; number of counterweight blocks. Now, when this is done, till this, you need the support of another mobile crane.

Detailed Explanation

Once the initial setup is complete, the next step is to add counterweights and the jib (the horizontal arm of the crane). Counterweights are added first to balance the structure, preventing it from tipping over. As the jib portion is lengthened, additional counterweights are incrementally added to maintain stability. During this phase, assistance from the mobile crane is still required to manage the heavy lifting and positioning of the components.

Examples & Analogies

This is like building a seesaw. When one side is heavy, you have to add weights to the other side to keep it balanced. If one half of the seesaw gets too long without extra weight, it could tip over. Similarly, the crane's long jib needs heavier counterweights to stay balanced.

Self-Erection Process

Unlock Audio Book

Signup and Enroll to the course for listening the Audio Book

Once this is done, then you can do the self-erection of the tower crane. So, how to do that? First, what you do is, you have to introduce a new section to increase the height of the tower crane with the help of trolling action. You know the trolling rate. There is a trolley here in the main jib. By the trolling action so, you can bring the, you see, here you can see, this is a new section. The new section is brought closer to the tower with the help of the trolling action.

Detailed Explanation

After establishing the base and adding elements, the next operation is the self-erection process itself. To increase the height of the tower crane, a new section is introduced using a 'trolley action.' The trolley, located in the main jib, allows the new section to be moved closer to the existing structure efficiently. This process marks the transition from needing external assistance to being able to self-manage the crane's height.

Examples & Analogies

Think of the way you can extend a telescope. You don’t need someone to help you every time—once you know how to pull the sections apart, you can adjust it as you want. Similarly, the crane can now 'grow' taller on its own by adding sections.

Bolting and Securing New Sections

Unlock Audio Book

Signup and Enroll to the course for listening the Audio Book

Now, what you do is unbolt your turntable base, unbolt your turntable base, unbolt it and lift it with the hydraulic jack in the climbing cage. This blue colour one is your climbing cage. So, this has a hydraulic cylinder, hydraulic jack system, you can see here. So, now, you unbolt the turntable and lift it with a hydraulic jack.

Detailed Explanation

Once the new section is brought into position, it's time to secure it in place. This involves unbolting the turntable base and using the hydraulic jack system within the climbing cage to lift it slightly. By lifting the base, a space is created, allowing for the new section to be bolted onto both the turntable and the main structure of the tower. This ensures the new height is stable and securely integrated into the crane's existing framework.

Examples & Analogies

Imagine you’re adding another floor to a Lego tower. You first have to remove a piece to make space, then carefully place the new block on top before securing it in place. This is how the turntable releases its load and accommodates new sections.

Continuing the Erection Process

Unlock Audio Book

Signup and Enroll to the course for listening the Audio Book

Every time, you have to do the trolling action and bring the new section near the tower and lift the turntable, unbolt the turntable, lift the turntable with the hydraulic jack, then introduce a new section, then again bolt it. Like this, you can keep on adding the sections.

Detailed Explanation

The self-erection process follows a systematic pattern. To repeat the process of adding height, you will always use the trolley action to bring each new section close to the tower. After lifting and securing the turntable again, the new section is firmly fastened into the tower structure. This method allows for progressive height increase in a controlled and efficient manner, shaping the final form of the crane.

Examples & Analogies

This is like stacking boxes on a shelf; you keep taking the next box, positioning it carefully, and putting it in place one at a time until your shelf reaches the height you want.

Dismantling the Crane

Unlock Audio Book

Signup and Enroll to the course for listening the Audio Book

Similarly, if you want to dismantle it, you do the entire thing in the reverse order. So, you can remove the section one by one with the tower crane. After the desired height is reached with the help of another mobile crane, you can remove the jib and the counter jib portion.

Detailed Explanation

When it comes time to take down the crane, the process is essentially the reverse of building it up. You’ll need to remove sections one at a time, starting with components like the jib and counter jib. Once you’ve finished the construction and reached the final height, the assistance of another mobile crane is required again to manage the removal of the larger pieces. This ensures the crane is safely dismantled without any risk of collapse.

Examples & Analogies

Think of it as taking apart a tent. You start by removing the poles and the outer fabric first, followed by smaller components, until everything is neatly packed away. Just like the crane, a careful reverse order ensures stability throughout the dismantling process.

Definitions & Key Concepts

Learn essential terms and foundational ideas that form the basis of the topic.

Key Concepts

  • Self-Erection Procedure: The method utilized by tower cranes to raise themselves using their climbing cage.

  • Foundation Preparation: Essential reinforcement and construction for crane stability.

  • Use of Mobile Crane: A critical aspect of initial assembly, providing support and stability.

  • Adding Height: The process of extending the crane using trolleying, unbolting, and hydraulic lifting.

  • Dismantling: The reverse process of the erection procedure is also essential for crane operations.

Examples & Real-Life Applications

See how the concepts apply in real-world scenarios to understand their practical implications.

Examples

  • When setting up a tower crane on a construction site, teams first construct a solid foundation that can withstand its weight.

  • In the self-erection process, a new section of the crane is lifted and bolted securely in place, demonstrating the importance of safety and proper technique.

Memory Aids

Use mnemonics, acronyms, or visual cues to help remember key information more easily.

🎵 Rhymes Time

  • To make the crane stand tall and proud, secure the base then raise it loud!

📖 Fascinating Stories

  • Imagine a tower crane at the top of a hill. Every time it needs to grow taller, it pulls a new section closer with its trolley, then cheers as it lifts itself with its jack!

🧠 Other Memory Gems

  • Fuzzy Cream Cookies Help—Foundation, Climbing cage, Counterweights, Hydraulic jacks, Erecting structure—steps in the self-erection process.

🎯 Super Acronyms

F-CHEES—Foundation, Climbing cage, Hydraulic jacks, Erecting, Self-erection - the steps to remember for tower crane erection.

Flash Cards

Review key concepts with flashcards.

Glossary of Terms

Review the Definitions for terms.

  • Term: Articulated Jib

    Definition:

    A type of crane with a flexible arm allowing for repositioning for increased height.

  • Term: Climbing Cage

    Definition:

    A mechanism that aids in the self-erection process of tower cranes by allowing components to be raised without additional cranes.

  • Term: Mobile Crane

    Definition:

    A crane that can be moved to different locations on-site, providing support for lifting operations.

  • Term: Turntable

    Definition:

    A rotating platform on a crane that allows movement of the boom.

  • Term: Counterweight

    Definition:

    Weights added to a crane to balance the load and prevent tipping.

  • Term: Hydraulic Jack

    Definition:

    A device that uses hydraulic pressure to lift heavy loads.