Erection of Tower Crane with Climbing Cage - 2 | 6. Types of Jib Cranes | Construction Engineering & Management - Vol 3
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

Interactive Audio Lesson

Listen to a student-teacher conversation explaining the topic in a relatable way.

Foundation Preparation for Tower Crane

Unlock Audio Lesson

0:00
Teacher
Teacher

Let’s start with the crucial first step: preparing the foundation for the tower crane. Why do you think a heavy foundation is essential?

Student 1
Student 1

I think it’s because the crane has to carry heavy loads, right?

Teacher
Teacher

Exactly! A solid foundation ensures stability and safety. It supports the significant weight of the crane and any loads it will lift. Can anyone tell me what reinforcement materials are commonly used?

Student 2
Student 2

Steel reinforcements?

Teacher
Teacher

Yes, that's correct! Steel reinforcement bars are commonly integrated into the concrete to enhance strength. Remember: we use the acronym 'SCORE' — *Steel, Concrete, Overload, Reinforcement, and Erect* — to remember the key components when preparing a foundation.

Student 3
Student 3

SCORE is easy to remember! What’s next after the foundation?

Teacher
Teacher

Once the foundation is set, we begin erecting the first sections of the tower. This involves bolting them securely to the foundation.

Student 4
Student 4

And that’s when the mobile crane comes into play?

Teacher
Teacher

Correct! The mobile crane is used to lift the initial sections before we utilize the climbing cage setup.

Teacher
Teacher

To summarize, the formation of a strong, reinforced foundation is vital as it's the base for stability. Now, let’s move on to the climbing cage setup!

Climbing Cage and its Advantages

Unlock Audio Lesson

0:00
Teacher
Teacher

Now let’s explore what the climbing cage does for the tower crane. What makes it different from other erection methods?

Student 1
Student 1

It allows the crane to lift itself up, right?

Teacher
Teacher

Exactly! The climbing cage utilizes hydraulic jacks to enable the crane to self-erect without needing a mobile crane for every stage. This significantly saves time and reduces operational costs.

Student 2
Student 2

So how does that work? Can you explain the process?

Teacher
Teacher

Sure! First, we must bolt the necessary parts like the turntable and the climbing cage on the initial sections. Then as we add new sections, we unbolt the turntable base, lift it with hydraulic jacks, and fit new tower sections underneath.

Student 3
Student 3

That sounds efficient! What if we need to dismantle it later?

Teacher
Teacher

Great question! Dismantling is relatively straightforward since we just reverse the erection process, but we always need to ensure everything is secured and stable.

Teacher
Teacher

In summary, the climbing cage is a major innovation in crane technology, enabling faster and safer erection and dismantling processes.

Maximum Height and Structural Support

Unlock Audio Lesson

0:00
Teacher
Teacher

Let's discuss height limitations. What’s the maximum standalone height for a typical tower crane?

Student 4
Student 4

I think it's between 60 to 120 meters?

Teacher
Teacher

Correct! Beyond 120 meters, what's required to ensure safety?

Student 1
Student 1

We need to brace it to the nearby structure.

Teacher
Teacher

Right again! Bracing distributes any overturning forces and improves stability.

Student 2
Student 2

What happens if we need to exceed 300 meters?

Teacher
Teacher

Excellent point! For heights greater than 300 meters, standard climbing cranes may not suffice, necessitating specially designed climbing tower cranes that grow with the structure during construction.

Teacher
Teacher

So, to recap, we have critical height limitations, emphasizing the importance of safety bracing once we go beyond 120 meters. Ready to dive into how we manage height extensions effectively?

Introduction & Overview

Read a summary of the section's main ideas. Choose from Basic, Medium, or Detailed.

Quick Overview

This section discusses the process of erecting a tower crane using a climbing cage, detailing the equipment involved, and how it enables self-erection.

Standard

The section outlines the method of erecting a tower crane equipped with a climbing cage, explaining the steps including foundation preparation, component assembly with hydraulic aids, and self-erection capabilities that reduce dependency on other cranes.

Detailed

Detailed Summary

The erection of a tower crane with a climbing cage is a modern construction technique that enhances the efficiency and safety of crane operations. The process begins with preparing a robust foundation tailored for the tower crane, which involves heavy reinforcement. Once the foundation is ready, the first few sections of the tower are bolted to the foundation. Subsequently, a mobile crane aids in erecting essential components such as the turntable, operator cap, climbing cage, and tower top.

Key Points:

  • Climbing Cage Advantage: The climbing cage, featuring a hydraulic jack system, enables self-erection after the initial setup with a mobile crane. This reduces time and reliance on additional equipment.
  • Installation Steps: After the initial foundation and tower sections are installed, the counter jib and counterweights are added. As the jib length increases, additional counterweights are balanced accordingly.
  • Self-Erection Mechanism: The self-erection process involves trolleying new mast sections closer, freeing up space under the turntable, and using hydraulic jacks to raise it, allowing for the installation of new sections.
  • Dismantling Process: The dismantling follows the reverse order of assembly, but the climbing cage simplifies this process as compared to traditional methods.
  • Height Limitations: It’s important to note the maximum allowable height for free-standing cranes varies between 60 to 120 meters, with climbing cranes required for greater heights, which utilize the structure itself for support.

Audio Book

Dive deep into the subject with an immersive audiobook experience.

Preparation for Erection

Unlock Audio Book

Signup and Enroll to the course for listening the Audio Book

Now, let us see how the erection of the tower crane is done with climbing cage. In modern tower cranes, we have this climbing cage facility which facilitates the self erection process of the crane. So, basically, what you have to do is first, you have to prepare the foundation for the tower crane that is very important. You have to prepare a heavy foundation for the tower crane according to the requirement, put heavy reinforcement and then both the tower sections to the foundation after construction of the first few sections of the tower crane.

Detailed Explanation

Before the tower crane can be erected, a strong foundation is essential. This foundation must be heavy and reinforced with appropriate materials to support the structure's weight. After completing the initial sections of the tower structure, these sections are anchored to the foundation securely. This process ensures that the crane has a stable base to operate safely.

Examples & Analogies

Think of the foundation of a tower crane like the foundation of a skyscraper. Just as a building requires a solid base to stand tall and secure, the tower crane needs the same type of strong foundation to ensure it functions properly without risking collapse.

Erecting Initial Components

Unlock Audio Book

Signup and Enroll to the course for listening the Audio Book

Now, what you do is, you erect your turntable or this slewing ring, operator cap and the tower top. For all these things, we need the support of another mobile crane. With the help of another mobile crane, you erect the turntable, climbing cage, this is your climbing cage, climbing cage with the hydraulic jack system. You will be seeing a hydraulic cylinder here which helps the lifting.

Detailed Explanation

Once the foundation is ready, the next step involves erecting the foundational components of the tower crane, including the turntable, climbing cage, operator cap, and the tower top. This step requires the assistance of a mobile crane, which will provide the necessary lift to position these components accurately. The climbing cage is equipped with a hydraulic jack system that enables it to raise and lower the crane as needed.

Examples & Analogies

Imagine setting up a large umbrella. You need another person to help hold it while you fix the pole in place and adjust the umbrella's height with its hydraulic mechanism. Similarly, a mobile crane helps position the key parts of the tower crane before it becomes operational.

Adding the Counter Jib

Unlock Audio Book

Signup and Enroll to the course for listening the Audio Book

So, the first, you put the foundation few sections of the tower mast you erected, bolted to the foundation then erect your climbing cage, your turntable or the slewing ring and the operator cap. And the tower top, you erect it. Then now, you put the counter jib with few counterweights. First, you put few counterweights, then slowly increase the jib portion.

Detailed Explanation

After setting up the initial components, the next step involves attaching the counter jib, which stabilizes the crane and keeps it balanced by using counterweights. It’s crucial to start with a few counterweights and gradually increase the jib portion to ensure stability. This careful approach helps maintain balance while the crane is in operation.

Examples & Analogies

Think of a seesaw in a playground. If one side has too many kids and the other has none, it’ll tip over. To balance it, you would add kids gradually to the lighter side. Similarly, the counter jib and weights of the tower crane ensure that it maintains balance while performing lifts.

Self-Erection Process Begins

Unlock Audio Book

Signup and Enroll to the course for listening the Audio Book

Once this is done, then you can do the self-erection of the tower crane. So, how to do that? First, what you do is, you have to introduce a new section to increase the height of the tower crane with the help of trolling action.

Detailed Explanation

With the initial assembly complete, the process of self-erection can now begin. This involves adding additional sections to the tower crane to increase its height. A method known as 'trolling' is used, where a new section is brought closer to the existing structure in preparation for attachment.

Examples & Analogies

Imagine a stack of toy blocks. Once you've built a few layers tall, you want to make it even taller. You would slide another block into place just underneath the last layer, which is like the trolling action that brings the new section in line for attachment to the crane.

Bolting New Sections

Unlock Audio Book

Signup and Enroll to the course for listening the Audio Book

Now, what you do is unbolt your turntable base, unbolt your turntable base, unbolt it and lift it with the hydraulic jack in the climbing cage. This blue colour one is your climbing cage. So, this has a hydraulic cylinder, hydraulic jack system, you can see here. So, now, you unbolt the turntable and lift it with a hydraulic jack. So, that you can create the space to introduce a new section.

Detailed Explanation

After successfully trolling the new section into position, the turntable base needs to be unbolted and lifted to create space for the new section to be attached. The hydraulic jack within the climbing cage performs this lift, allowing the crew to connect the new section to the structure securely.

Examples & Analogies

Think about adjusting the height of a lamp by lifting its shade. You first have to loosen it or unbolt it before you can slide it higher or lower. In the crane’s case, when the turntable is lifted, it allows for a new section to fit securely just like adjusting that lamp's height.

Continuing the Erection Process

Unlock Audio Book

Signup and Enroll to the course for listening the Audio Book

You are going to create a space below the turntable. So that you can introduce a new section below the turntable. Now, once the space is created, now, you introduce a section into this space into this climbing cage. Now, you bolt the new section to the turntable as well as to the remaining portion of the tower. So, that is how the new section is now connected. So, like this, you can keep on adding the sections.

Detailed Explanation

Once the space is made by lifting the turntable, the new section is positioned and bolted securely to both the turntable and the existing tower structure. This allows for multiple sections to be added during the self-erection process until the desired height is achieved.

Examples & Analogies

Building a LEGO tower, after modifying a base element, you simply add another block on top. The connection is made strong, allowing you to keep stacking higher just like adding sections to the tower crane.

Dismantling with Climbing Cage

Unlock Audio Book

Signup and Enroll to the course for listening the Audio Book

Similarly, if you want to dismantle it, you do the entire thing in the reverse order. So, you can remove the section one by one with the tower crane. After the desired height is reached with the help of another mobile crane, you can remove the jib and the counter jib portion.

Detailed Explanation

The dismantling process of the tower crane with a climbing cage occurs in reverse order of the erection process. The sections are removed one by one, often facilitated by a mobile crane if necessary, and components like the jib and counter jib are also taken off, ensuring safe and efficient disassembly.

Examples & Analogies

Taking apart a piece of furniture can be similar; you unscrew and remove one part at a time, like legs or shelves, until it’s all dismantled safely. You might need a friend’s help for larger pieces, much like how a mobile crane assists in removing larger components of the crane.

Height Limit Considerations

Unlock Audio Book

Signup and Enroll to the course for listening the Audio Book

Another important thing, you need to know that is the maximum free standing tower crane height permissible is 60 to 120 meter. So, beyond 120 meters, the tower crane should take the help from the structure. You should properly brace it to the nearby structure to transfer the overturning movement to the structure from the stability point of view.

Detailed Explanation

Tower cranes have height limitations that must be followed to ensure safety and stability. The maximum free-standing height generally ranges from 60 to 120 meters. If the crane needs to operate at heights beyond this limit, it must be braced and secured to the building structure itself to manage the forces acting on it.

Examples & Analogies

When scaling a tall ladder, you would want to secure the ladder to something stable, like a wall, particularly if you reach a great height. Just as you need that extra support to avoid falling, taller cranes must also be secured to prevent losing stability.

Dismantling Without Climbing Cage

Unlock Audio Book

Signup and Enroll to the course for listening the Audio Book

If there is no climbing cage, we need the support of another mobile crane for the entire process. Say, first, you have to remove the trolley part you have to remove the trolley. So, after removing the trolley, you remove the counterweights. You remove the counterweights then you remove the jib. So, then you remove the counter jibs.

Detailed Explanation

In cases where a climbing cage is absent, the entire dismantling process becomes more complex and requires a mobile crane throughout. The procedures include systematic removal starting from the trolley, followed by counterweights, the jib, and finally, the counter jibs, ensuring everything is taken down safely and correctly.

Examples & Analogies

Imagine taking down a large tree house without a ladder. You might need a team of friends to help you reach different parts and carefully dismantle sections. You remove one piece at a time, employing the support of friends, just like you would use a mobile crane to help take apart a tower crane without added support.

Climbing Tower Cranes for Tall Structures

Unlock Audio Book

Signup and Enroll to the course for listening the Audio Book

Say, for example, you need a tower crane for a structure which is greater than 300 meters. In that case, what is the option available? There are certain special cranes called as climbing tower cranes which can grow along with the structure.

Detailed Explanation

For buildings exceeding 300 meters, traditional tower cranes are insufficient. Climbing tower cranes are specifically designed to adapt to the building's height, allowing them to be supported by the structure as it rises. This ensures that they can safely function at greater heights by shifting their support point as new floors are added.

Examples & Analogies

Think of a plant growing beside a trellis. As it grows taller, it might latch onto the trellis for support, helping it reach even greater heights than it could on its own. Similarly, climbing tower cranes 'attach' to a building to grow higher and continue operating safely.

Definitions & Key Concepts

Learn essential terms and foundational ideas that form the basis of the topic.

Key Concepts

  • Climbing Cage: A mechanism that allows for self-erection, reducing reliance on mobile cranes.

  • Counterweight Importance: Essential for maintaining balance during lifting operations.

  • Hydraulic Mechanism: Used to aid lifting and positioning of crane components.

  • Foundation Stability: A strong foundation is crucial for safety and operational efficiency.

  • Height Limitations: Understanding the maximum safe height for crane operations is critical.

Examples & Real-Life Applications

See how the concepts apply in real-world scenarios to understand their practical implications.

Examples

  • When erecting a tower crane, a mobile crane is first required to lift the initial sections. After establishing the foundation, the assembly of the climbing cage begins.

  • In a construction project exceeding 120 meters, bracing the crane to the building structure is mandatory to ensure stability.

Memory Aids

Use mnemonics, acronyms, or visual cues to help remember key information more easily.

🎵 Rhymes Time

  • For a crane to stand up tall, a steady base is key for all.

📖 Fascinating Stories

  • Imagine a tall tower crane growing taller with a magical climbing cage, lifting its sections like a superhero. It needs a strong foundation just like a tree needs roots.

🎯 Super Acronyms

Use 'TACS' to remember

  • Tower
  • Assemble
  • Climbing cage
  • Self-erection procedures.

Flash Cards

Review key concepts with flashcards.

Glossary of Terms

Review the Definitions for terms.

  • Term: Climbing Cage

    Definition:

    A hydraulic lift mechanism that allows a tower crane to self-erect by adding sections to its height without the need for additional cranes.

  • Term: Counterweight

    Definition:

    Additional weight used on the opposite side of the crane to balance loads and prevent tipping.

  • Term: Hydraulic Jack

    Definition:

    A device that uses hydraulic power to raise or lower heavy objects, crucial in the raising process of tower cranes.

  • Term: Turntable

    Definition:

    The rotating section of the crane that allows the boom to move and position loads across the working area.

  • Term: Foundation

    Definition:

    The underlying support structure on which a tower crane is erected, ensuring stability and safety during operation.