Foundation Preparation - 2.1 | 6. Types of Jib Cranes | Construction Engineering & Management - Vol 3
Students

Academic Programs

AI-powered learning for grades 8-12, aligned with major curricula

Professional

Professional Courses

Industry-relevant training in Business, Technology, and Design

Games

Interactive Games

Fun games to boost memory, math, typing, and English skills

Foundation Preparation

2.1 - Foundation Preparation

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Practice

Interactive Audio Lesson

Listen to a student-teacher conversation explaining the topic in a relatable way.

Understanding Articulated Jib Cranes

🔒 Unlock Audio Lesson

Sign up and enroll to listen to this audio lesson

0:00
--:--
Teacher
Teacher Instructor

Today, we will start by discussing articulated jib cranes. They are distinct from horizontal boom cranes because they can reposition their hinged jibs.

Student 1
Student 1

What's the advantage of being able to reposition the jib?

Teacher
Teacher Instructor

Great question! By converting excess horizontal reach into vertical height, articulated jib cranes can optimize their lifting capabilities based on the specific requirements of a job site.

Student 2
Student 2

So, they can adjust to lift higher loads when needed?

Teacher
Teacher Instructor

Exactly! This flexibility is crucial in construction where height requirements can change.

Student 3
Student 3

Are they more expensive than regular cranes?

Teacher
Teacher Instructor

Yes, articulated jib cranes are generally more costly due to their advanced features.

Teacher
Teacher Instructor

In summary, articulated jib cranes offer essential flexibility in their operation by converting horizontal reach to vertical height.

Foundation Preparation for Tower Cranes

🔒 Unlock Audio Lesson

Sign up and enroll to listen to this audio lesson

0:00
--:--
Teacher
Teacher Instructor

Now, let’s focus on the essential foundation preparations for tower cranes. Can anyone guess why a solid foundation is crucial?

Student 4
Student 4

Because cranes are heavy?

Teacher
Teacher Instructor

Exactly! A solid foundation ensures stability and support for the crane, especially since they can reach high heights.

Student 1
Student 1

What happens if the foundation isn't strong enough?

Teacher
Teacher Instructor

Poor foundations can lead to instability, endangering safety and reducing lifting capacity. This is why reinforcing the foundation is critical.

Student 2
Student 2

How is the foundation prepared?

Teacher
Teacher Instructor

The groundwork involves heavy reinforcement, ensuring it meets the tower crane’s requirements. After preparation, we can move on to erecting the initial sections.

Teacher
Teacher Instructor

To conclude, remember that a sturdy foundation is the start of erecting a safe and functional tower crane.

Erection Process of Tower Cranes

🔒 Unlock Audio Lesson

Sign up and enroll to listen to this audio lesson

0:00
--:--
Teacher
Teacher Instructor

Let's dive into the erection process of tower cranes with a special focus on the climbing cage. Who remembers what the climbing cage does?

Student 3
Student 3

It helps with self-erection, right?

Teacher
Teacher Instructor

Exactly! It allows the crane to add sections without needing extra crane support after the initial setup.

Student 4
Student 4

What is the first step in this process?

Teacher
Teacher Instructor

First, we attach the initial sections to the reinforced foundation. Followed by the installation of the turntable and climbing cage, this usually requires a mobile crane.

Student 1
Student 1

And then we add new sections, right?

Teacher
Teacher Instructor

Yes, through the self-erection procedure using a hydraulic jack system to lift new sections into place.

Teacher
Teacher Instructor

In summary, this step-by-step process allows us to securely raise the height of the tower crane while ensuring safety and efficiency.

Dismantling the Tower Crane

🔒 Unlock Audio Lesson

Sign up and enroll to listen to this audio lesson

0:00
--:--
Teacher
Teacher Instructor

Moving on, let's discuss the dismantling process of tower cranes. What do you think is the first step?

Student 2
Student 2

Removing the trolley?

Teacher
Teacher Instructor

Correct! First, we need to remove the trolley followed by the counterweights and the jib.

Student 3
Student 3

Can we do this all by ourselves?

Teacher
Teacher Instructor

If there is no climbing cage, yes, a mobile crane's assistance is often necessary throughout the dismantling process.

Student 4
Student 4

What about working at great heights?

Teacher
Teacher Instructor

Excellent point! Safety measures are essential when working with high cranes; otherwise, disassembly could put workers at risk.

Teacher
Teacher Instructor

In summary, dismantling requires careful consideration and often the use of a mobile crane unless a climbing cage is utilized.

Height Limitations and Solutions

🔒 Unlock Audio Lesson

Sign up and enroll to listen to this audio lesson

0:00
--:--
Teacher
Teacher Instructor

Finally, let's explore height limitations for tower cranes. What do you think the maximum height is without additional support?

Student 1
Student 1

I think it's around 120 meters?

Teacher
Teacher Instructor

That’s correct! Beyond that, lateral bracing becomes necessary for safety.

Student 2
Student 2

And what do we do for heights exceeding 300 meters?

Teacher
Teacher Instructor

We utilize climbing tower cranes that can grow with the structure, using hydraulic systems to move as construction progresses.

Student 3
Student 3

So, they adjust as the building height increases?

Teacher
Teacher Instructor

Exactly! This flexibility allows our cranes to function efficiently even at great heights.

Teacher
Teacher Instructor

To summarize, understanding height limitations is crucial for safety and efficiency in crane operation.

Introduction & Overview

Read summaries of the section's main ideas at different levels of detail.

Quick Overview

The section discusses various types of jib cranes and emphasizes the importance of proper foundation preparation for tower cranes.

Standard

This section examines different types of jib cranes, particularly articulated jib cranes and their unique repositioning capabilities. Additionally, it outlines the process of erecting tower cranes, focusing on the necessary foundational preparations and the role of climbing cages in facilitating self-erection.

Detailed

Foundation Preparation

This section covers the essential preparations required for erecting a tower crane, with a primary focus on the foundation and the erection procedures. Various types of jib cranes, particularly articulated jib cranes, are introduced, highlighting their ability to reposition for optimal hook height, converting horizontal reach to vertical lift when necessary.

Types of Jib Cranes

  • Articulated Jib Crane: Capable of repositioning its hinged jibs to optimize hook height.

Erection Process of Tower Cranes

  • Foundation Preparation: A heavy foundation is critical, including substantial reinforcement.
  • Erection Steps: The initial sections are attached to the foundation, followed by the installation of the turntable, climbing cage, and operator cap, usually requiring the assistance of another mobile crane.
  • Climbing Cage Advantage: Supports self-erection, allowing further sections to be added without additional mobile crane assistance after the initial setup.
  • Self-Erection Procedure: Describes how additional sections are installed using trolling actions and hydraulic jacks.
  • Dismantling Process: Outlines the steps to safely dismantle the crane when it is no longer needed, emphasizing the usage of a mobile crane when a climbing cage isn't available.
  • Height Limitations: Discusses maximum free-standing height limits (120-300 meters) and solutions for exceeding these limits with climbing tower cranes.

Audio Book

Dive deep into the subject with an immersive audiobook experience.

Importance of Foundation Preparation

Chapter 1 of 5

🔒 Unlock Audio Chapter

Sign up and enroll to access the full audio experience

0:00
--:--

Chapter Content

Now, let us see how the erection of the tower crane is done with climbing cage. In modern tower cranes, we have this climbing cage facility which facilitates the self erection process of the crane. So, basically, what you have to do is first, you have to prepare the foundation for the tower crane that is very important. You have to prepare a heavy foundation for the tower crane according to the requirement, put heavy reinforcement and then both the tower sections to the foundation after construction of the first few sections of the tower crane.

Detailed Explanation

Before erecting a tower crane, proper foundation preparation is crucial. The foundation must be strong enough to support the weight and stress of the crane during operation. This involves creating a heavy foundation that meets specific requirements. Reinforcement, usually with steel, is included in the foundation to add strength and stability. After the initial section of the crane is constructed, it will be anchored to this foundation, allowing the crane to safely operate.

Examples & Analogies

Think of a tower crane like a large tree; just as a tree needs deep roots to stand strong against winds and storms, a crane requires a solid foundation to support its high structure and heavy loads.

Erection Process of the Tower Crane

Chapter 2 of 5

🔒 Unlock Audio Chapter

Sign up and enroll to access the full audio experience

0:00
--:--

Chapter Content

Now, what you do is, you erect your turntable or this slewing ring, operator cap and the tower top. For all these things, we need the support of another mobile crane. With the help of another mobile crane, you erect the turntable, climbing cage, this is your climbing cage, climbing cage with the hydraulic jack system. You will be seeing a hydraulic cylinder here which helps the lifting.

Detailed Explanation

Once the foundation is set, the next step is to erect various components of the crane. This includes installing the turntable, which allows the crane to rotate, the climbing cage that aids in self-erection, and the operator's cabin (cap). A mobile crane is required to lift and position these heavy components accurately. The climbing cage features a hydraulic jack which assists in lifting these parts into place.

Examples & Analogies

Imagine building a large model with parts that are too heavy to lift on your own. You'd need a friend's help (the mobile crane) to lift and position the parts accurately before you can continue with building your model.

Using Counterweights

Chapter 3 of 5

🔒 Unlock Audio Chapter

Sign up and enroll to access the full audio experience

0:00
--:--

Chapter Content

Then now, you put the counter jib with few counterweights. First, you put few counterweights, then slowly increase the jib portion. As you increase the jib portion sections, you can increase the number of blocks here; number of counterweight blocks. Now, when this is done, till this, you need the support of another mobile crane. After this, you can do the erection process yourself with the climbing cage help without the help of another crane.

Detailed Explanation

Counterweights are added to stabilize the crane. They help balance the load being lifted, preventing the crane from tipping over. Initially, a few counterweights are installed, and as the jib (the horizontal arm) is lengthened, more counterweights are added accordingly. The introduction of the climbing cage allows for self-erection, meaning cranes can continue to build themselves without external assistance after the initial setup.

Examples & Analogies

Think of the crane as a seesaw. When a heavier child sits on one side, the other side needs more weight to balance. Similarly, counterweights ensure the crane remains balanced, especially when it lifts heavy loads.

Self-Erection of Tower Crane

Chapter 4 of 5

🔒 Unlock Audio Chapter

Sign up and enroll to access the full audio experience

0:00
--:--

Chapter Content

Once this is done, then you can do the self-erection of the tower crane. So, how to do that? First, what you do is, you have to introduce a new section to increase the height of the tower crane with the help of trolling action. You know the trolling rate. There is a trolley here in the main jib. By the trolling action so, you can bring the, you see, here you can see, this is a new section. The new section is brought closer to the tower with the help of the trolling action.

Detailed Explanation

To increase the height of the tower crane, new sections are added. This process, called self-erection, involves moving a new section into position with the help of a trolley mechanism. Once the new section is aligned with the current structure, it is bolted into place, allowing the crane to grow in height as required for the construction project.

Examples & Analogies

Consider putting together a tall Lego tower. You must move a new Lego piece close to the existing structure and snap it on securely to increase the height of your creation.

Dismantling the Crane

Chapter 5 of 5

🔒 Unlock Audio Chapter

Sign up and enroll to access the full audio experience

0:00
--:--

Chapter Content

Similarly, if you want to dismantle it, you do the entire thing in the reverse order. So, you can remove the section one by one with the tower crane. After the desired height is reached with the help of another mobile crane, you can remove the jib and the counter jib portion.

Detailed Explanation

When it's time to take down the crane, the process is essentially the reverse of the erection procedure. Sections are removed one by one, starting with the outer parts like the jib and counter jib. A mobile crane may be needed initially for the larger, heavier pieces. This systematic dismantling ensures safety and organization during the process.

Examples & Analogies

Think of taking down a tower of blocks you built. You would start by carefully removing the top blocks before tackling the larger base pieces, ensuring your whole structure does not topple dangerously.

Key Concepts

  • Articulated Jib Crane: A crane that can reposition for optimal lift height.

  • Foundation Preparation: Crucial for crane stability and safety.

  • Self-Erection: Process allowing tower cranes to increase height without mobile crane assistance.

Examples & Applications

An articulated jib crane can lift materials to a height of 40 meters by converting horizontal reach into vertical height.

In a construction site, a tower crane's foundation is reinforced with concrete and steel to ensure it can support the crane and added loads.

Memory Aids

Interactive tools to help you remember key concepts

🎵

Rhymes

When a tower crane must grow, a climbing cage helps it flow, vertical heights take the show!

📖

Stories

Imagine a crane that could dance, it sways from tall to wide at a glance, using its articulated arms to embrace the structure and enhance!

🧠

Memory Tools

Remember 'FAS' for foundation preparation: Foundation (solid), Attach initial sections, Support with mobile crane.

🎯

Acronyms

CAGE

Climbing

Adds

Great

Elevation - what the climbing cage does!

Flash Cards

Glossary

Articulated Jib Crane

A crane with hinged jibs that can reposition for optimal hook height.

Foundation Preparation

The process of constructing a solid base for tower cranes to ensure stability and safety.

Climbing Cage

A support system allowing a tower crane to self-erect by facilitating the lifting of new sections.

SelfErection

A process wherein the tower crane can add height to itself using a climbing cage.

Turntable

The rotating base of a tower crane on which the operator's cab and other components sit.

Reference links

Supplementary resources to enhance your learning experience.