Cost Considerations - 1.2 | 6. Types of Jib Cranes | Construction Engineering & Management - Vol 3
Students

Academic Programs

AI-powered learning for grades 8-12, aligned with major curricula

Professional

Professional Courses

Industry-relevant training in Business, Technology, and Design

Games

Interactive Games

Fun games to boost memory, math, typing, and English skills

Cost Considerations

1.2 - Cost Considerations

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Practice

Interactive Audio Lesson

Listen to a student-teacher conversation explaining the topic in a relatable way.

Articulated Jib Cranes

🔒 Unlock Audio Lesson

Sign up and enroll to listen to this audio lesson

0:00
--:--
Teacher
Teacher Instructor

Today, we're going to discuss articulated jib cranes. Can anyone tell me what their main advantage is in construction?

Student 1
Student 1

Are they good for adjusting height?

Teacher
Teacher Instructor

Exactly! Articulated jib cranes can reposition their hinged jibs to convert excess horizontal reach into vertical height. This versatility, however, comes with a higher cost. Remember, 'Adapt and Save' - that's our mnemonic for understanding why these cranes are costly.

Student 2
Student 2

How do you adjust the height?

Teacher
Teacher Instructor

Great question! By repositioning the hinge of their jib, these cranes allow for adjustable reach and height. Can anyone remember the acronym we use to recall the types of cranes?

Student 3
Student 3

Is it 'HLA' for Horizontal, Luffing, and Articulated?

Teacher
Teacher Instructor

Correct! HLA helps us remember — Horizontal boom, Luffing boom, and Articulated jib cranes. They each have unique functions and costs.

Student 4
Student 4

So can we use the articulated jib for any kind of construction?

Teacher
Teacher Instructor

Yes, but cost-effectiveness must be considered based on the project’s needs and the crane’s capabilities.

Teacher
Teacher Instructor

Summarizing today’s session: Articulated jib cranes are versatile and highly adjustable but are also costlier due to their complex mechanisms.

Erection Process with Climbing Cages

🔒 Unlock Audio Lesson

Sign up and enroll to listen to this audio lesson

0:00
--:--
Teacher
Teacher Instructor

Now, let’s move on to the erection process of tower cranes. Class, what do you think is the first step?

Student 1
Student 1

Building a sturdy foundation?

Teacher
Teacher Instructor

Exactly right! A proper foundation is crucial. Then, we use a mobile crane for the initial setups.

Student 2
Student 2

Why is the mobile crane only needed at the start?

Teacher
Teacher Instructor

Good question! Once a few sections of the tower are erected, we can use climbing cages to self-erect the rest. Remember, 'Foundation First, Mobile Crane Next!'

Student 3
Student 3

How does the climbing cage help with erection?

Teacher
Teacher Instructor

The climbing cage allows the crane to lift itself as more sections are added, reducing reliance on a mobile crane and saving costs. Who can explain the next step after positioning the climbing cage?

Student 4
Student 4

We need to add counterweights before extending the jib, right?

Teacher
Teacher Instructor

Exactly! That’s an important safety consideration. To summarize, the erection process utilizes a sturdy foundation first, then employs the mobile crane and eventually transitions to self-erection with climbing cages.

Climbing Tower Cranes

🔒 Unlock Audio Lesson

Sign up and enroll to listen to this audio lesson

0:00
--:--
Teacher
Teacher Instructor

Now, let’s explore climbing tower cranes. Why do we need them for taller structures?

Student 1
Student 1

They probably need to climb as the building grows?

Teacher
Teacher Instructor

Exactly! As the structure grows, climbing cranes utilize their support from the building's floors. Remember, 'Climb as You Build' to recall this concept.

Student 2
Student 2

What happens if the structure exceeds 300 meters?

Teacher
Teacher Instructor

That's a great point! Beyond that height, lateral bracing is essential for stability, and we cannot solely rely on climbing cranes.

Student 3
Student 3

How do they attach to the building?

Teacher
Teacher Instructor

Good question! Climbing cranes attach to completed floors via special collars. This process enables the building’s structure to support the crane as it ascends.

Teacher
Teacher Instructor

To summarize, climbing tower cranes are designed to grow with structures, requiring support from the building’s floors.

Cost Considerations in Crane Selection

🔒 Unlock Audio Lesson

Sign up and enroll to listen to this audio lesson

0:00
--:--
Teacher
Teacher Instructor

Lastly, let’s wrap up by discussing cost considerations. Why do you think cost is an essential factor in crane selection?

Student 1
Student 1

Because it affects the project budget?

Teacher
Teacher Instructor

Exactly! The choice of crane can greatly impact project costs. Remember, our phrase 'Cost Over Capacity' which means we must balance between what we can spend and the required lifting capacity.

Student 2
Student 2

What are the risks of choosing a crane with too high a capacity?

Teacher
Teacher Instructor

Excellent question! Overloading cranes can lead to structural failures. Hence, evaluating each crane's specifications against the project needs is critical.

Student 3
Student 3

What do we do when the crane needs to be lifted high?

Teacher
Teacher Instructor

In such cases, climbing cranes should be considered again, but always keep a budget in mind!

Teacher
Teacher Instructor

To summarize today: Cost considerations are vital when selecting cranes based on the lifting capacity and project characteristics.

Introduction & Overview

Read summaries of the section's main ideas at different levels of detail.

Quick Overview

The section discusses the different types of tower cranes and their erection processes, emphasizing the importance of cost considerations and methods.

Standard

This section explores various types of tower cranes, particularly the articulated jib and climbing tower cranes, and details the erection procedure utilizing climbing cages. It emphasizes the significance of cost implications related to crane choice and their erection methodology.

Detailed

Cost Considerations

This section outlines the various types of cranes used in construction, specifically focusing on articulated jib cranes and climbing tower cranes. Articulated jib cranes can adjust their hinged jibs to convert excess horizontal reach into vertical height, which offers flexibility but comes at a higher cost. The erection process of tower cranes is explored in-depth, especially with the use of climbing cages that allow for self-erection. The initial steps involve preparing a sturdy foundation and using a mobile crane for initial setups. As the construction progresses, the capability to self-erect becomes essential, establishing a more efficient process that can save time and labor costs. Cost considerations in selecting cranes are paramount, as articulated jib cranes, while highly versatile, represent a higher expenditure. Additionally, safety margins and the structural limits that affect lifting capacity are highlighted, ensuring that cranes are not overloaded during operations. As the focus shifts to climbing tower cranes, their unique ability to support construction in higher structures is emphasized.

Audio Book

Dive deep into the subject with an immersive audiobook experience.

Types of Jibs

Chapter 1 of 7

🔒 Unlock Audio Chapter

Sign up and enroll to access the full audio experience

0:00
--:--

Chapter Content

There is another type of jib apart from the horizontal boom, luffing boom. You also have this articulated jib tower crane.

Detailed Explanation

In the construction industry, a jib refers to the arm of a crane that extends to lift and move materials. This section begins by distinguishing different types of jibs: the horizontal boom and the luffing boom. The luffing boom can change its angle and reach, allowing greater flexibility in lifting operations. The articulated jib tower crane mentioned combines the advantages of both types, providing adaptability in various lifting situations.

Examples & Analogies

Think of it like an adjustable ladder: a fixed ladder is like a horizontal boom, while an adjustable ladder that can tilt is akin to a luffing boom. The articulated jib crane is like being able to bend the ladder at different angles to reach different heights, making it more versatile.

Cost Implications of Articulated Jibs

Chapter 2 of 7

🔒 Unlock Audio Chapter

Sign up and enroll to access the full audio experience

0:00
--:--

Chapter Content

These articulated jib cranes are able to reposition their hinged jibs to convert the excess hook ridge to added hook height that means so, you can reposition the jib in such a way that.

Detailed Explanation

Articulated jib cranes are expensive because of their ability to adjust their jibs to maximize vertical height when horizontal reach is not needed. This adaptability often justifies the higher costs in work settings where precise lifting is critical. However, this increased flexibility also leads to higher initial costs when purchasing such cranes.

Examples & Analogies

Consider a high-tech Swiss Army knife: it can do many things, but it’s more expensive than a simple knife because of its versatility. Similarly, articulated jib cranes offer multiple functionalities, which justifies their higher price.

Foundation Preparation for Tower Cranes

Chapter 3 of 7

🔒 Unlock Audio Chapter

Sign up and enroll to access the full audio experience

0:00
--:--

Chapter Content

Now, let us see how the erection of the tower crane is done with climbing cage. In modern tower cranes, we have this climbing cage facility which facilitates the self-erection process of the crane.

Detailed Explanation

A critical step in using tower cranes is preparing a solid foundation. This foundation needs to support the entire structure, thus requiring heavy reinforcement. The ‘climbing cage’ allows the tower crane to erect itself. Initially, the tower’s first sections are constructed, and then the climbing cage supports further assembly. The accuracy of this groundwork directly affects the crane's stability and safety during operation.

Examples & Analogies

Building a strong foundation is like setting up the legs of a table; if the legs are weak or uneven, the table will wobble and not function correctly. Similarly, a crane requires a firm and level base to operate safely.

Erection Steps Using a Climbing Cage

Chapter 4 of 7

🔒 Unlock Audio Chapter

Sign up and enroll to access the full audio experience

0:00
--:--

Chapter Content

First, you have to prepare the foundation for the tower crane that is very important. You have to prepare a heavy foundation for the tower crane according to the requirement, put heavy reinforcement and then both the tower sections to the foundation after construction of the first few sections of the tower crane.

Detailed Explanation

The process of erecting a tower crane involves several steps. After laying a solid foundation, the first sections of the tower are erected with a mobile crane's help. The climbing cage, which operates on a hydraulic jack system, assists in lifting the upper sections of the crane. This procedure allows the tower crane to gradually build its height while ensuring safety and stability.

Examples & Analogies

Imagine you are building a Lego tower; you start with a strong base and build level by level, ensuring each layer is securely connected before adding the next. This ensures that your entire tower stands straight and tall without collapsing.

Self-Erection Process of Tower Cranes

Chapter 5 of 7

🔒 Unlock Audio Chapter

Sign up and enroll to access the full audio experience

0:00
--:--

Chapter Content

Every time, you have to do the trolling action and bring the new section closer to the tower and lift the turntable, unbolt the turntable, lift it with a hydraulic jack.

Detailed Explanation

In the self-erection of a tower crane, a new section is added to the existing structure using a trolley system. This involves unbolting the turntable, lifting it with a hydraulic jack, and inserting the new section. This system allows cranes to add height incrementally without needing a second mobile crane after the initial setup.

Examples & Analogies

This self-erection can be compared to stacking books on a tall shelf. As you place new books, you might lift the shelf slightly to create space for new ones. Once the first few are stacked, you can keep adding more on your own without needing help.

Dismantling Procedures

Chapter 6 of 7

🔒 Unlock Audio Chapter

Sign up and enroll to access the full audio experience

0:00
--:--

Chapter Content

When you want to dismantle it, you do the entire thing in the reverse order.

Detailed Explanation

Dismantling a tower crane follows the reverse steps of its erection process. The crane is taken apart in a specific order to maintain safety and efficiency. Initially, components like the jib and counterweights are removed, followed by the operator's cap and top of the tower. Understanding this reverse process is crucial for safe operations.

Examples & Analogies

Think about a toy building set; to take it apart, you should remove the top pieces before the bottom ones. Dismantling from the top allows you to safely and easily remove each layer without causing the structure to collapse.

Maximum Height Considerations

Chapter 7 of 7

🔒 Unlock Audio Chapter

Sign up and enroll to access the full audio experience

0:00
--:--

Chapter Content

The maximum free standing tower crane height permissible is 60 to 120 meters.

Detailed Explanation

There are limits to how tall a free-standing tower crane can be, generally ranging from 60 to 120 meters. Beyond this height, additional structural support is necessary to ensure safety and stability, often involving lateral bracing to connect with nearby structures. This regulation is crucial for preventing accidents and maintaining structural integrity.

Examples & Analogies

This limitation is similar to a pencil placed upright; it can stand on its own to a certain height but becomes unstable if it goes too high. To support it, you would lean it against something solid to prevent it from falling.

Key Concepts

  • Articulated Jib vs. Traditional Cranes: This distinction allows for adjusted reach based on project needs.

  • Climbing Cranes: Innovative cranes that adjust height as structures grow, saving time and labor.

  • Self-Erection: The use of climbing cages facilitates crane assembly without constant reliance on mobile cranes.

Examples & Applications

An articulated jib crane converting horizontal reach into a higher lift for tight spaces on a construction site.

A construction project over 200 meters high utilizing climbing tower cranes to move materials efficiently.

Memory Aids

Interactive tools to help you remember key concepts

🎵

Rhymes

Articulated jibs extend quite high, adjusting reach towards the sky!

📖

Stories

Imagine a giant helping friends climb, using its flexible arm to reach high in no time!

🧠

Memory Tools

Remember 'HLA' for Horizontal, Luffing, Articulated cranes.

🎯

Acronyms

To recall cost considerations

'CAP' — Cost

Adaptability

Purpose.

Flash Cards

Glossary

Articulated Jib Crane

A type of crane that features a hinged arm, allowing it to adjust its reach and height.

Climbing Tower Crane

A crane designed to rise as construction progresses, utilizing support from the building's structure.

Erection Process

The procedure of assembling and constructing cranes at a job site.

Foundation

The base upon which a crane is secured, ensuring stability during lifting operations.

Counterweight

Weights added to a crane to balance lifting forces and prevent tipping.

Reference links

Supplementary resources to enhance your learning experience.