Enrol to start learning
Reading is open to everyone. Enrolling is free, and it is what unlocks the audio lessons, practice tests and progress tracking.
16.5.3. Transportation
This section
Practice test
12 questions on this section. Wrong answers show you what to read again.
Sign up to take itWhole chapter
Revision test
Mixed questions from across the chapter. Your answers get marked.
Sign up to take itQuick
Flashcard drill
3 cards from this lesson. Good the night before a test.
Try these first
- 1.
What is the common time frame for transporting concrete before it starts to set?
Hint
Remember the initial state of concrete.
- 2.
Name one type of vehicle used for transporting concrete.
Hint
Think about how concrete is mixed on the way to a site.
- 3.
What is the maximum time frame for transporting concrete before it begins to set?
- 10-15 minutes
- 20-25 minutes
- 30-45 minutes
Hint
It's essential for workability.
- 4.
True or False: A transit mixer can help maintain the workability of concrete during transport.
- True
- False
Hint
Consider how they are designed.
- 5.
Create a protocol for a construction site managing concrete delivery during high temperatures over 90°F.
Hint
Consider the properties of concrete in heat.
- 6.
Develop a logistic plan that ensures minimal delivery time while maximizing the quality of the concrete.
Hint
Think about how to manage time effectively.
Exercises
Total Questions
2
Estimated Time
4 min
Passing Score
70%
Instructions
- Read each question carefully
- You can use hints if you need help
- Complete all questions before submitting
4 more questions available
Enrol freeQuiz
Total Questions
2
Estimated Time
4 min
Passing Score
70%
Instructions
- Read each question carefully
- You can use hints if you need help
- Complete all questions before submitting
2 more questions available
Enrol freeChallenge Problems
Total Questions
2
Estimated Time
4 min
Passing Score
70%
Instructions
- Read each question carefully
- You can use hints if you need help
- Complete all questions before submitting