Building Planning and Computer- aided Civil Engineering drawing | 9. Sanction Drawing by Abraham | Learn Smarter
Students

Academic Programs

AI-powered learning for grades 8-12, aligned with major curricula

Professional

Professional Courses

Industry-relevant training in Business, Technology, and Design

Games

Interactive Games

Fun games to boost memory, math, typing, and English skills

9. Sanction Drawing

9. Sanction Drawing

The chapter focuses on the essential components and requirements for creating a sanction drawing in building planning and drawing. It emphasizes the need for a comprehensive working plan that includes specific location details, mandatory instructions for construction, and maintenance of compliance with local regulations, such as the provision for rainwater harvesting. The chapter underscores the implications of child labor laws in the construction industry and the importance of accessibility and compliance in building projects.

12 sections

Enroll to start learning

You've not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Sections

Navigate through the learning materials and practice exercises.

  1. 9
    Sanction Drawing

    Sanction drawings are essential working plans that include specific details...

  2. 9.1.1
    Location Map

    This section outlines the requirement and significance of the location map...

  3. 9.1.2

    The Key Plan is a crucial component of the Sanction Drawing used in building...

  4. 9.1.3
    Details Of In-Charge Engineer

    This section outlines the significance of including the In-Charge Engineer's...

  5. 9.1.4
    Details Of Sanctioning Authority

    This section outlines the essential components of a Sanction Plan, including...

  6. 9.1.5
    Details Of Plot Area

    This section outlines the essential components and mandatory instructions...

  7. 9.2
    Mandatory Instructions

    The section outlines mandatory instructions for building plans to ensure...

  8. 9.2.1
    Basement And Parking Regulations

    This section outlines the regulations and requirements for basements and...

  9. 9.2.2
    Provision For Telephone And Postal Services

    This section outlines the requirements for incorporating telephone and...

  10. 9.2.3
    Display Of Licences And Approved Plans

    This section outlines the requirements for licensing and the display of...

  11. 9.2.4
    Rainwater Harvesting Structures

    Rainwater harvesting structures are essential components mandated for proper...

  12. 9.2.5
    Prohibition Of Child Labour

    This section highlights the strict prohibition of child labour in...

What we have learnt

  • Sanction drawings must include various details like maps, plans, and approval signatures.
  • Mandatory instructions for construction ensure safety and compliance with local regulations.
  • Rainwater harvesting is required to maintain environmental sustainability in building designs.

Key Concepts

-- Sanction Drawing
A working plan that includes mandatory details such as a location map, key plans, authority details, and area specifications.
-- Mandatory Instructions
Specific regulations that must be adhered to in building projects, including the prohibition of child labor and requirements for parking and sanitation.
-- Rainwater Harvesting
A system designed to collect and store rainwater for non-potable use or groundwater recharge, mandated by building regulations.

Additional Learning Materials

Supplementary resources to enhance your learning experience.