Key Plan - 9.1.2 | 9. Sanction Drawing | Building Planning and Computer- aided Civil Engineering drawing
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

Interactive Audio Lesson

Listen to a student-teacher conversation explaining the topic in a relatable way.

Introduction to the Key Plan

Unlock Audio Lesson

0:00
Teacher
Teacher

Today, we'll learn about the Key Plan, an essential component in building planning. Can anyone tell me why such plans are necessary in construction?

Student 1
Student 1

I think they help us understand the layout of the building?

Teacher
Teacher

Exactly! The Key Plan offers a visual layout that provides context. It includes location maps and details like ward numbers and the corporation division. These elements help in legal approval. Can anyone list what specific details a Key Plan should include?

Student 2
Student 2

It should include details about the In-charge Engineer and the owner's information!

Teacher
Teacher

Great point, Student_2! Additionally, it should also include specifics like the plot area and space for the authority’s seal. Remember this acronym: *LAKE* for Location, Area, Key details, and Endorsement to recall these critical components.

Student 3
Student 3

What does FAR stand for again?

Teacher
Teacher

FAR stands for Floor Area Ratio, which is crucial for understanding the building’s density. It's a significant metric in building regulations. Can someone give a quick example of why FAR matters?

Student 4
Student 4

FAR helps determine how much building you can construct on a given plot, right?

Teacher
Teacher

Exactly! To summarize, a Key Plan is vital for building approval, and it includes components like location, owner details, and FAR. Remember the acronym *LAKE* to help you recall key aspects.

Mandatory Instructions

Unlock Audio Lesson

0:00
Teacher
Teacher

Now that we've covered the Key Plan, let's dive into some mandatory instructions that must be included. Can anyone think of some examples?

Student 1
Student 1

Maybe about how parking areas should just be for parking?

Teacher
Teacher

Yes, mandatory instructions state that parts of the ground floor reserved for parking cannot be converted. This helps in maintaining proper parking availability. What else is important?

Student 2
Student 2

I remember something about telephone ducts and postal services mentioned!

Teacher
Teacher

Exactly! Provision of necessary ducts for telephone lines and designated spaces for postal services are crucial for functionality. Let's use the mnemonic *DUPS* — Ducts, Utility spaces, Parking restrictions, to remember these mandates. Can anyone think of why these instructions are important?

Student 3
Student 3

They ensure everything is in place for people to live and work comfortably!

Teacher
Teacher

Perfect! It’s about maintaining a community-friendly environment and ensuring efficiency in building design. To recap, we've learned that mandatory instructions like the DUPS mnemonic keep our plans functional and useful in real-world scenarios.

Sustainable Practices in Building Planning

Unlock Audio Lesson

0:00
Teacher
Teacher

Sustainability is a key aspect of modern building planning. Who can tell me one of the sustainable practices mentioned in our guidelines?

Student 4
Student 4

Rainwater Harvesting Structures?

Teacher
Teacher

Exactly! The plans must include these structures for collecting and managing rainwater. Why do you think this is essential?

Student 1
Student 1

It helps conserve water and recharge groundwater!

Teacher
Teacher

Correct! Water conservation is critical in sustainable building practices. To remember this concept, you might find the phrase *HARVEST* helpful — Harvesting Appropriate Resources for Vital Environmental Sustainability Techniques. Can someone give an example of how this could be executed in building design?

Student 2
Student 2

Installing drainage systems that direct water to storage tanks?

Teacher
Teacher

Absolutely! Effective design maximizes utility while being environmentally responsible. In summary, our Key Plan must incorporate sustainable practices like rainwater harvesting, as encapsulated in the *HARVEST* mnemonic.

Introduction & Overview

Read a summary of the section's main ideas. Choose from Basic, Medium, or Detailed.

Quick Overview

The Key Plan is a crucial component of the Sanction Drawing used in building planning, detailing essential elements necessary for legal approval.

Standard

This section outlines the importance and requirements of the Key Plan, which includes essential information such as location maps and specifics regarding plot and built area, ensuring compliance with local building regulations.

Detailed

Detailed Summary

The Key Plan serves as an integral part of the Sanction Drawing within the broader context of Computer Aided Building Planning and Drawing. This plan includes several key elements: 1) a location map that situates the building within its surrounding context; 2) critical details specifying ward numbers, corporation divisions, and information about responsible authorities including the In-charge Engineer and owner; 3) authentication details from the Sanctioning Authority, with provisions for official seals and signatures; and 4) information regarding the plot’s dimensions, including various areas related to the construction, such as built-up, plinth area, and Floor Area Ratio (FAR).

The section also highlights mandatory instructions that must be adhered to, such as restrictions on basement and parking floor usage, the necessity for installation of communication ducts, and regulations regarding Rainwater Harvesting Systems, contributing to sustainable building practices. Emphasis is placed on the prohibition of child labor in construction, underscoring ethical compliance in building practices. Understanding these elements is vital for anyone involved in building planning, ensuring that projects remain within legal and professional standards.

Youtube Videos

Plan and elevation
Plan and elevation
Building floor plan design | 18x27 House Plan | 2bhk house plan autocad #housedesign #2d #home
Building floor plan design | 18x27 House Plan | 2bhk house plan autocad #housedesign #2d #home
PRINCIPLES OF BUILDING PLANNING !! RESIDENTIAL BUILDING !! CIVIL ENGINEERING DRAWING !! HOME DESIGN
PRINCIPLES OF BUILDING PLANNING !! RESIDENTIAL BUILDING !! CIVIL ENGINEERING DRAWING !! HOME DESIGN
42x27 house plan | Architectural drawing in autocad | Building plan drawing #buildingplans #house
42x27 house plan | Architectural drawing in autocad | Building plan drawing #buildingplans #house
Civil engineering drawing house plan | New house plan design | 17x30 House Plan #home #housedesign
Civil engineering drawing house plan | New house plan design | 17x30 House Plan #home #housedesign
Simple floor plan with dimensions | 29x34 House Plans #homedesign #shorts #architecture
Simple floor plan with dimensions | 29x34 House Plans #homedesign #shorts #architecture
AutoCAD Simple Line Plan | Simple Steps Fast Way | For Civil & Arch
AutoCAD Simple Line Plan | Simple Steps Fast Way | For Civil & Arch
28×34 house plan #civil_engineering #ghar_ka_naksha #house_plan #building#civil#homeplan#home#shorts
28×34 house plan #civil_engineering #ghar_ka_naksha #house_plan #building#civil#homeplan#home#shorts
Drawing floor plans - the different stages
Drawing floor plans - the different stages
Floor Plan Drawing by @kha.nanaa #archisource #architecture #floorplans #drawingprocess #floorplan
Floor Plan Drawing by @kha.nanaa #archisource #architecture #floorplans #drawingprocess #floorplan

Audio Book

Dive deep into the subject with an immersive audiobook experience.

Definition of Sanction Drawing

Unlock Audio Book

Signup and Enroll to the course for listening the Audio Book

A working plan having the following additional drawings/ details is referred as Sanction Plan.

Detailed Explanation

A 'Sanction Drawing' is a comprehensive working plan that includes crucial additional details. This means that it is not just a simple blueprint but involves various components that provide essential information for the structure's approval and construction. The main purpose of a Sanction Drawing is to ensure that the building meets all required regulations and standards before it can be constructed.

Examples & Analogies

Think of a Sanction Drawing as a recipe for baking a cake. Just like a recipe outlines all the ingredients and steps required to create a delicious cake, a Sanction Drawing details all the aspects necessary to build a safe and compliant structure.

Components of a Sanction Plan

Unlock Audio Book

Signup and Enroll to the course for listening the Audio Book

  1. Location map
  2. Key plan
  3. Details having ward no., corporation division, details of In-charge Engineer, owner‟s name and present address.
  4. Details of Sanctioning Authority along with the space for seal and signature of approval.
  5. Details of plot area, built up area, plinth area and FAR (approved and proposed).

Detailed Explanation

A Sanction Plan is composed of several key components that provide detailed information about the project. Each item serves a specific purpose:
1. Location map: Shows where the building will be situated.
2. Key plan: Offers a quick overview of the layout and significant features.
3. Ward and Corporation Division Details: Identifies governmental accountability structures and relevant information about the engineer in charge.
4. Sanctioning Authority Details: Specifies who has the authority to approve the plan, including space for necessary approvals.
5. Area Details: Provides measurements and calculations regarding plot and building dimensions, crucial for zoning and construction considerations.

Examples & Analogies

Consider the components of a Sanction Plan as the chapters in a textbook. Just like a textbook contains various chapters that cover different topics for comprehensive understanding, a Sanction Plan contains multiple details that together provide a complete overview for the approval process.

Mandatory Instructions

Unlock Audio Book

Signup and Enroll to the course for listening the Audio Book

  1. Basement/ Stilt floor/ GF and part of ground floor where car parking is shown is reserved for parking purpose only and shall not be converted to any other purpose.
  2. Necessary ducts for telephone cables, cubicles at ground level for postal services and space for dumping garbage within the premises shall be provided.
  3. Licence and approved plans shall be display in a conspicuous place of the licensed premises.
  4. The applicant shall ensure that the Rainwater Harvesting Structures are provided and maintained in good condition for storage of water for non-potable purposes or recharge of ground water at all times having a minimum total capacity mentioned in the bye-laws 32(a).

Detailed Explanation

The mandatory instructions are critical to ensuring compliance with building regulations and promoting safety and sustainability. Each point emphasizes pivotal responsibilities the applicant must uphold:
1. Parking Restrictions: Certain floors are designated solely for parking to avoid misuse and to maintain traffic flow.
2. Infrastructure Requirements: Provisions for essential services and utilities must be integrated into the design to ensure functionality.
3. Display of Licenses: Ensuring licenses and plans are visible reminds everyone of the regulations governing the building.
4. Rainwater Harvesting: This focuses on sustainability, requiring the applicant to implement systems for catching rainwater, which supports responsible water usage and management.

Examples & Analogies

Imagine these mandatory instructions as rules in a game. Just like rules are established to keep everyone playing fairly and safely, these instructions ensure that building projects are conducted in a way that safeguards public interest and promotes responsible building practices.

Definitions & Key Concepts

Learn essential terms and foundational ideas that form the basis of the topic.

Key Concepts

  • Sanction Drawing: Legal document essential for starting construction.

  • Key Plan: A part of the sanction drawing that details critical project information.

  • FAR: Ensures compliance with zoning laws regarding space utilization.

  • Rainwater Harvesting: An eco-friendly system for managing water resources in buildings.

  • Child Labor Prohibition: Legal and ethical mandate to protect children.

Examples & Real-Life Applications

See how the concepts apply in real-world scenarios to understand their practical implications.

Examples

  • A Key Plan includes a location map showing where a building will be situated within the city layout.

  • Rainwater Harvesting Systems can be designed to hold a specific volume, as indicated in building regulations, to efficiently store rainwater.

Memory Aids

Use mnemonics, acronyms, or visual cues to help remember key information more easily.

🎵 Rhymes Time

  • For a Key Plan with sanction in hand, check the map, the details, and the land.

📖 Fascinating Stories

  • Imagine a builders' meeting where the planner highlights the Key Plan, emphasizing the inclusion of the location and sustainable practices, leading to discussions about ethical labor.

🧠 Other Memory Gems

  • Remember DUPS for Ducts, Utility spaces, Parking restrictions in building plans.

🎯 Super Acronyms

Use *LAKE* - Location, Area, Key details, Endorsements to recall Key Plan components.

Flash Cards

Review key concepts with flashcards.

Glossary of Terms

Review the Definitions for terms.

  • Term: Sanction Drawing

    Definition:

    A working plan approved by authorities, allowing construction to commence legally.

  • Term: Key Plan

    Definition:

    A detailed part of the sanction drawing that includes significant information such as location maps, zoning, and essential project details.

  • Term: Floor Area Ratio (FAR)

    Definition:

    A measure used in urban planning to determine the allowable amount of building area relative to the plot size.

  • Term: Rainwater Harvesting

    Definition:

    The process of collecting and storing rainwater for reuse, contributing to sustainable management and conservation of water resources.

  • Term: Child Labor

    Definition:

    The employment of children in work that deprives them of their childhood and potential.