Practice Fresh Concrete Tests for SCC - 12.3 | 8. Workability of Fresh Concrete | Concrete Technology
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

12.3 - Fresh Concrete Tests for SCC

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What does SCC stand for?

💡 Hint: Think about the properties of the concrete.

Question 2

Easy

What does the Slump Flow Test measure?

💡 Hint: Consider what we are trying to observe with concrete flow.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is the purpose of the Slump Flow Test?

  • To measure compressive strength
  • To assess flowability
  • To check curing time

💡 Hint: Think about what flowability means in concrete.

Question 2

True or False: The V-Funnel Test is used to evaluate a concrete's resistance to segregation.

  • True
  • False

💡 Hint: Link it back to the flow characteristics.

Solve 2 more questions and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

A construction project requires SCC to pass through tightly spaced rebar without segregation. Which tests would be essential to ensure this property, and why?

💡 Hint: Focus on the tests that assess flow through narrow spaces.

Question 2

Analyze how the viscosity measured in a V-Funnel test can affect the speed of concrete placement in a construction project.

💡 Hint: Consider how viscosity relates to the flow rate and placement speed.

Challenge and get performance evaluation