1 - Productivity of Shovel
Enroll to start learning
You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.
Practice Questions
Test your understanding with targeted questions
What is the ideal angle for truck placement in relation to the shovel?
💡 Hint: Think about reducing cycle time.
Why is it important to have clearance for the tail swing of a shovel?
💡 Hint: Consider how shovel moves.
4 more questions available
Interactive Quizzes
Quick quizzes to reinforce your learning
What is the ideal angle of swing for minimizing productivity loss?
💡 Hint: Think about how swing angles impact cyclical operations.
True or False: An increased swing angle can decrease cycle time.
💡 Hint: Remember the relationship between swing and cycle times.
2 more questions available
Challenge Problems
Push your limits with advanced challenges
If a shovel has an average cycle time of 30 seconds and the truck is positioned at 120 degrees, how would you estimate the increase in cycle time? Calculate using an assumed factor for swing angles over 90 degrees.
💡 Hint: Review the swing angle impacts discussed earlier.
A project requires you to optimize a shovel’s productivity running on a 6-hour shift. If the shovel operates efficiently for only 75% of that time, calculate the effective productive time. Include factors affecting operational time, like wait times for trucks and equipment adjustments.
💡 Hint: Account for the job efficiency discussed in class.