Practice Ductile Detailing as per IS 13920: 2016 - 41.12 | 41. Design as per the Codes | Earthquake Engineering - Vol 3
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

41.12 - Ductile Detailing as per IS 13920: 2016

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What is the main purpose of minimum reinforcement limits in beams?

💡 Hint: Think about the loads beams carry.

Question 2

Easy

Define what a hinge zone is.

💡 Hint: It helps with energy dissipation.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is the importance of anchorage length for bars in ductile detailing?

  • Ensures effective load transfer
  • Has no effect
  • Is irrelevant

💡 Hint: Think about how loads are managed in concrete.

Question 2

True or False: Transverse reinforcement in columns is only necessary for aesthetic purposes.

  • True
  • False

💡 Hint: Remember, aesthetics aren’t a priority in seismic design!

Solve 1 more question and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

Propose a ductile detailing design for a medium-rise building and detail the beam, column, and joint configurations including reinforcement values.

💡 Hint: Remember to keep the structural hierarchy in mind as you design.

Question 2

Evaluate a given design for shear walls including mapping out the impact of openings and proposing solutions to maintain structural integrity.

💡 Hint: Refer to both design principles and real-life examples that illustrate effective detailing.

Challenge and get performance evaluation