Practice Standard BVA vs. '3-Point' (or 'Weak Normal') BVA: Degrees of Rigor - 6.2.3 | Software Engineering - Unit Testing Techniques | Software Engineering Micro Specialization
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Academics
Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Professional Courses
Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skillsβ€”perfect for learners of all ages.

games

6.2.3 - Standard BVA vs. '3-Point' (or 'Weak Normal') BVA: Degrees of Rigor

Learning

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What is Boundary Value Analysis?

πŸ’‘ Hint: Consider where errors might frequently occur in input processing.

Question 2

Easy

How many values does Standard BVA test for each boundary?

πŸ’‘ Hint: Think about how you would check the limits in a numerical range.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is the main purpose of Boundary Value Analysis (BVA)?

  • To test in the middle of input ranges
  • To validate boundaries where errors occur
  • To minimize testing time

πŸ’‘ Hint: Think about where most coding mistakes happen.

Question 2

True or False: 3-Point BVA includes testing values just below and above the boundaries.

  • True
  • False

πŸ’‘ Hint: Consider how many values are really tested in 3-Point BVA.

Solve and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

Design a test suite using both Standard BVA and 3-Point BVA for a date input range of January 1 to December 31.

πŸ’‘ Hint: Remember to address both boundary and typical cases.

Question 2

Explain why using only 3-Point BVA can lead to potential software issues using an example.

πŸ’‘ Hint: Think about what happens at those critical points of transition.

Challenge and get performance evaluation