Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.
Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.
Enroll to start learning
You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.
Listen to a student-teacher conversation explaining the topic in a relatable way.
Today we're discussing back-track loading. Can anyone tell me how this method works?
Is it when the pusher goes back after pushing one scraper?
Exactly, Student_1! So, once scraper 1 is loaded, the pusher detaches, backtracks to scraper 2, and then pushes it forward again. This tends to increase the cycle time, making it the slowest method of loading. Do you understand why?
Because it has to return back before moving forward?
That’s right, Student_2! Keep that in mind: **Backtrack = Slow**. Now, why might people still use this method even if it's slow?
Maybe because it's easier to control the direction of the load?
Exactly, people prefer working in the same direction for operational ease. Great analysis, folks!
Can you summarize back-track loading briefly?
Sure! Back-track loading is common but slow due to the return travel time after loading each scraper. A good way to remember this is 'Backtrack = Delay'!
Next, we have chain loading! Who can explain the process involved?
There’s no need for the pusher to backtrack; scraper 2 waits near the pusher, right?
Correct, Student_1! In this method, once scraper 1 is loaded, the pusher moves directly to scraper 2, reducing return time drastically. Why is that significant?
It means quicker operations and higher efficiency?
Exactly! A mnemonic for this is **Chain = Fast**. Chain loading is best suited for operations like long narrow road cuts. Does that clarify it for everyone?
Yes, the efficiency makes it preferable, especially for long distances.
Correct! So, remember, chain loading is quicker due to minimized travel time.
Now, let's talk about shuttle loading. Student_2, can you describe when this method is applied?
Maybe when there are fill areas in both directions?
Exactly! So the pusher detaches from scraper 1 and pushes another scraper in the opposite direction. This allows for flexibility in loading. Can anyone tell me how this affects cycle time?
It reduces return time like chain loading, right?
Correct! Remember this: **Shuttle = Dual Direction**. This method is less common but highly effective in specific situations. Any questions?
What’s the main advantage again?
The main advantage is reduced cycle time due to simultaneous loading actions, allowing scrapers to work back and forth. Great participation everyone!
So, we’ve discussed three loading methods. Student_1, can you summarize the points of comparison?
Back-track is the slowest, chain is faster, and shuttle is used for fill areas in both directions?
Good summary, Student_1! Remember: **Backtrack = Slow, Chain = Fast, Shuttle = Flexible**. Why do we care about cycle times?
Because shorter cycle times means higher productivity?
Precisely! Balancing scrapers and pushers also minimizes idle times, maximizing efficiency. Any questions on cycle time calculations?
Could you remind us of the formula?
Definitely! The formula is **Tp = 1.4Lt + 0.25** for calculating cycle time based on the loading time of the scraper. Excellent job today!
Read a summary of the section's main ideas. Choose from Basic, Medium, or Detailed.
This section explores various loading methods, including back-track, chain, and shuttle loading, detailing their operational mechanics and efficiencies. While back-track loading is the slowest method due to return travel time, chain and shuttle loading reduce cycle times with specific applications for effective operations.
In this section, we discuss three different loading methods used for scrapers: back-track loading, chain loading, and shuttle loading.
Dive deep into the subject with an immersive audiobook experience.
Signup and Enroll to the course for listening the Audio Book
So, once the loading of scraper 1 is completed, the pusher will back-track, return back and spot the next scraper, scraper 2 and start pushing it in the same direction.
So, that is what is back-track loading. So, first it is pushing the scraper 1, as a scraper 1 is completely loaded it will start moving on its own. Once the scraper 1 is loaded, your pusher will get detached and return; that is backtracking. It has to travel some distance and spot the next scraper 2. And then start pushing again in the same direction.
In back-track loading, when the first scraper (scraper 1) finishes loading, the pusher, which is a machine assisting with the loading, detaches from scraper 1 and needs to travel back to locate the next scraper (scraper 2). This movement is called backtracking. After backtracking, the pusher resumes pushing scraper 2 in the same direction as before.
Imagine a delivery truck that drops off packages at a warehouse. Once the truck has unloaded all its packages (like scraper 1 finishing its loading), it has to drive back to the loading dock to get more packages (backtracking) before delivering again. This adds time to each delivery cycle.
Signup and Enroll to the course for listening the Audio Book
One limitation of this back-track loading method is it needs additional time for returning back (backtracking). So, we call this the slowest method. The actual value will depend upon your project site, but basically, the back-track method takes longer time because the pusher has to backtrack and spot the next scraper.
Back-track loading is considered slow because of the extra time required for the pusher to return to pick up the next scraper. This time can vary based on the site conditions but generally increases the overall loading time, making it the slowest of the methods discussed.
Think of it like a food truck that has to return to its kitchen after every customer to restock ingredients for the next order. While this is a reliable way to operate, it means the truck spends more time returning than it does serving customers, leading to longer wait times.
Signup and Enroll to the course for listening the Audio Book
Despite its limitations, the back-track loading method is commonly adopted because people prefer cutting in the same direction.
Even though back-track loading is the slowest method, it remains popular. This is primarily because it allows for working consistently in the same direction, which can simplify operations and increase safety for workers on-site.
Consider a train that follows a single track back and forth. It might take longer to load and unload passengers by stopping at each side, but it provides a steady route that everyone can rely on, avoiding confusion about changing paths.
Signup and Enroll to the course for listening the Audio Book
The next method is shuttle loading, which is not commonly followed, but you can follow it when you have 2 fill areas in both directions. In shuttle loading, after the pusher detaches from scraper 1, it begins pushing another scraper in the opposite direction, allowing scrapers to move in both directions at the site.
Shuttle loading is a method used when there are two active loading areas, allowing for more efficient operations. Instead of backtracking, the pusher can immediately start working on another scraper (scraper 2) moving in the opposite direction. This reduces return time and can lead to faster cycle times compared to back-track loading.
Imagine a school bus making rounds. Instead of driving back to the school after every drop-off, the bus can start picking up students from a different neighborhood right after dropping off its last group. This way, it minimizes travel time and increases the number of students it can serve effortlessly.
Signup and Enroll to the course for listening the Audio Book
When you compare all these three methods, you see that back-track loading is the slowest due to its longer cycle time, while chain and shuttle loading have shorter cycle times due to reduced return times.
In summary, back-track loading is slower because of the time taken to return to pick up the next scraper. In contrast, methods like chain loading and shuttle loading enhance efficiency by reducing the time needed to switch between scrapers, making them generally preferable if conditions allow.
Think of a chef in a restaurant preparing meals. If the chef has to return to a central kitchen after each dish (back-track loading), it takes longer overall. If they can start preparing a new dish as soon as the last is done without returning to the kitchen until the meal is complete (shuttle loading), service is faster and more efficient.
Signup and Enroll to the course for listening the Audio Book
To determine the cycle time of the pusher, you can use the formula: Tp = 1.4Lt + 0.25, where Tp is the pusher cycle time and Lt is the scraper load time.
This formula helps calculate how long it takes for the pusher to complete its cycle based on the loading time of the scraper. Understanding cycle times enables better planning and efficiency on construction sites.
It's like figuring out how long it takes a train to complete a trip based on how long it takes to load passengers and reach new stations. If you know the average loading time, you can estimate overall travel time and schedule accordingly.
Learn essential terms and foundational ideas that form the basis of the topic.
Key Concepts
Back-Track Loading: The slowest loading method due to return travel needs.
Chain Loading: An efficient method specifically for narrow cuts.
Shuttle Loading: Utilizes dual fill areas, allowing for simultaneous operations.
Cycle Time Calculation: A formula to determine pusher timing based on the scraper loading time.
See how the concepts apply in real-world scenarios to understand their practical implications.
In a construction project involving a narrow road, chain loading would be preferable for efficiency and speed.
In a site where two fill areas are accessible, utilizing shuttle loading can optimize loading operations.
Use mnemonics, acronyms, or visual cues to help remember key information more easily.
When loading scrapers, don't delay, Backtrack's the slowest, that's the way.
Imagine a race where loaders push and pull, Back-track gets tired, while Chain runs full.
B-C-S: Backtrack = Slow, Chain = Fast, Shuttle = Flexible!
Review key concepts with flashcards.
Review the Definitions for terms.
Term: BackTrack Loading
Definition:
A loading method where the pusher detaches, returns to the previous scraper, and pushes it forward, requiring additional time.
Term: Chain Loading
Definition:
A loading method where the pusher moves directly to the waiting next scraper without returning, optimizing time efficiency.
Term: Shuttle Loading
Definition:
A loading method used when fill areas are available in both directions, allowing simultaneous operation of scrapers.
Term: Cycle Time
Definition:
The total time taken for a complete loading and unload cycle, including backtracking or straight movements.
Term: Pusher
Definition:
The equipment that pushes scrapers forward during the loading process.
Term: Scraper
Definition:
An earth-moving machine designed to load, haul, and dump material.