Practice Earth Moving Equipment-Scrapers (Part-2) - 1 | 9. Earth Moving Equipment-Scrapers (Part-2) | Construction Engineering & Management - Vol 2
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

Define the term 'swell factor'.

💡 Hint: Think of it as a measure of how much the material expands when disturbed.

Question 2

Easy

What is included in cycle time calculations for scrapers?

💡 Hint: Consider all the actions the scraper takes to complete its job.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is the swell factor?

  • The weight of material
  • The ratio of loose dry unit weight to bank dry unit weight
  • A type of soil

💡 Hint: Think about material properties relevant to earth moving.

Question 2

True or False: A pusher increases the swell factor by 5%.

  • True
  • False

💡 Hint: Recall how pressure impacts material density.

Solve 1 more question and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

A scraper has a heaped capacity of 30 m³. If the swell factor is modified by a 15% increase when a pusher assists, calculate the effective bank volume it can carry.

💡 Hint: Split the problem into steps, starting with the effective load and then modifying the swell factor.

Question 2

Calculate the total cycle time if a scraper has loading time of 1.2 minutes, dump time of 0.5 minutes, and return to load time of 2 minutes.

💡 Hint: Make sure to factor in all components, even shorter ones.

Challenge and get performance evaluation