Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.
Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.
Enroll to start learning
You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.
Listen to a student-teacher conversation explaining the topic in a relatable way.
Today, we’re diving deep into scrapers, a vital part of earth-moving equipment. Can anyone tell me what a scraper does?
A scraper moves earth from one place to another!
Exactly! Scrapers are designed to handle and transport earth materials. Now, they operate through a cycle that involves both loading and hauling. Can someone explain the components involved in a typical scraper operation?
Isn't there a pusher involved?
Yes! The pusher assists the scraper during the loading phase. So remember the acronym PLS - Pusher Loads Scraper. It’s vital for smooth operations.
Let’s summarize: Scrapers transport materials, and their efficiency greatly depends on the support from pushers.
Next, let's talk about the swell factor. Can anyone describe what it is?
I think it’s the ratio of loose dry unit weight to bank dry unit weight?
Correct! And did you know it changes when using a pusher? For push-loaded scrapers, it can increase by 10%. Remember, S10 means Swell increases by 10%!
So that means we have to adjust our calculations for volume and weight?
Exactly! Adjusting for this factor ensures our load calculations remain accurate. So, make it a habit to check swell factor effects in your estimates.
Let’s move on to productivity estimation. How do we factor in rolling resistance along the haul route? What do we define it as?
It’s usually expressed in kg per ton, right?
Correct! For our case, it’s 50 kg per ton, translating to a 5% gradient. Can someone share the implication of this on our haul time?
It increases the time taken to haul material since the machine has to work against resistance.
Well said! That means our overall cycle time goes up, affecting productivity. Today's memory aid: 'Resistance Rides on Routes.' Identify and calculate resistance effectively to manage speed.
Now let’s estimate cycle times for scrapers and pushers. Who remembers the cycle times we need to calculate?
Is it the loading, dumping, and turn times?
Exactly! These times add up for the total cycle. Can someone do the math for the scraper's total cycle time based on the provided values?
I think it’s loading time plus dump time plus travel time?
Great! Remember to also consider that the pusher's cycle time must be shorter to maintain efficiency. To summarize today: Cycle times dictate productivity. Keep an eye on these metrics!
Read a summary of the section's main ideas. Choose from Basic, Medium, or Detailed.
The section delves into the operation, types, and components of scrapers in earth-moving equipment, including essential calculations for productivity estimation and balancing the number of scrapers and pushers in construction practices.
This section discusses the characteristics and productivity of scrapers, crucial components of earth-moving equipment. Throughout the text, the lecture emphasizes the productivity estimation of scrapers, focusing on variables such as unit weight, swell factor, rolling resistance, and safe operating weight.
Understanding these characteristics is essential for civil engineering students and professionals focused on maximizing the efficiency and safety of construction operations. Proper management of these variables supports heavier loads and improved productivity while ensuring equipment longevity.
Dive deep into the subject with an immersive audiobook experience.
Signup and Enroll to the course for listening the Audio Book
The swell factor has been given as 0.80. You should note that the swell factor will increase by 10 % due to pushing. This is particularly important for the push-loaded scrapers.
The swell factor is a measurement used to describe the volume change of soil when it is excavated and moved. It represents the ratio of the volume of loose soil to the volume of bank soil. In this section, the initial swell factor is given as 0.80, indicating that when the soil is disturbed, it increases in volume when it becomes loose. The important part is that when a pusher assists a scraper, the swell factor increases by an additional 10% due to compaction from the push. This is because the pushing action helps pack the soil more tightly into the scraper’s bowl, resulting in denser material.
Consider a sponge soaked in water. When the sponge is compressed (like the pushing action), it holds less air and more water, making it denser. Similarly, when pushing compresses soil in a scraper, it results in more compact material being loaded.
Signup and Enroll to the course for listening the Audio Book
Assume the rolling resistance of 50 kg per ton for this particular haul route. This can be converted into an equivalent gradient of 5%.
Rolling resistance refers to the resistance that a vehicle experiences due to contact with the surface it is moving on. In this case, it is quantified as 50 kg of resistance for every ton of shipped material. To contextualize it, this rolling resistance can be expressed as a gradient—5% in this case—indicating that for every 100 units of horizontal distance traveled, the scraper would need to overcome an equivalent vertical climb that would require an additional force equivalent to lifting 5% of its load.
Think of riding a bicycle on different surfaces. It's much harder to ride uphill (the equivalent of a gradient) than on flat ground. Similarly, rolling resistance represents the effort you must exert to keep moving the scraper along the haul route, with gradients affecting how much extra effort is required.
Signup and Enroll to the course for listening the Audio Book
The expected load will be 95% of the heaped capacity which is given as 23.70 meter cube. The average loading time is set at 0.8 minutes.
In excavation and material handling, it’s standard practice not to load machinery to full capacity to allow for operational efficiency and prevent overloading, which can lead to longer loading times and potential machine failure. Here, it's stated that the scraper will operate at 95% of its maximum capacity, equating to approximately 22.52 cubic meters. The average loading time of 0.8 minutes indicates how long it takes to fill the scraper before it goes to dump its load. This chosen loading rate aids in ensuring consistent productivity and prevents wear on the machinery.
Imagine packing a suitcase for travel. If you try to cram it to its full capacity, it becomes unwieldy and difficult to manage. Instead, leaving some space allows not just easy closing but also the flexibility to add a few last-minute items. In the same way, loading a scraper to 95% ensures it operates smoothly without excess strain.
Signup and Enroll to the course for listening the Audio Book
The maximum rated load the scraper can carry is 34,019.42 kg. This safe operating weight affects the structural frame of the machine.
Every piece of heavy machinery has a maximum rated load specified by the manufacturer, which indicates how much weight it can safely carry without risking damage or reducing its operational lifespan. Exceeding this safe operating weight can lead to structural failure or breakdowns, adversely affecting not only the machine but also safety precautions for the operators. It's essential that operators are aware of the weight of the material being loaded and monitor it closely to stay within this safe operational boundary.
Think of the weight limit on an elevator. Just like how exceeding that limit can cause the elevator to malfunction or break, overloading a scraper risks damaging its components and increases the chance of accidents during operation.
Learn essential terms and foundational ideas that form the basis of the topic.
Key Concepts
Swell Factor: A ratio critical for converting loose material volume into bank volume.
Rolling Resistance: A key factor affecting haul time, calculated in kg per ton.
Cycle Time: The total time for a loading and hauling operation, which must be minimized for efficiency.
Gross Weight: The total weight of the scraper and its load, important for calculating productivity.
Safe Operating Weight: The manufacturer-specified maximum load the equipment can handle safely.
See how the concepts apply in real-world scenarios to understand their practical implications.
Example of calculating the resistance on a haul route using the given gradients and rolling resistance.
Scenario where the efficiency of scrapers is analyzed based on their productivity when using pushers.
Use mnemonics, acronyms, or visual cues to help remember key information more easily.
When earth is loose and waiting, a swell factor you're calculating.
Imagine a pusher that helps a heavy scraper move faster; it compresses the load so it can haul much better.
Remember the acronym ARM: Acceleration, Resistance, Material when considering scraper performance.
Review key concepts with flashcards.
Review the Definitions for terms.
Term: Swell Factor
Definition:
The ratio of the loose dry unit weight of the material to its bank dry unit weight; a vital parameter in calculating changes in volume.
Term: Rolling Resistance
Definition:
The resistance encountered by earth-moving equipment due to its weight and surface interaction, typically expressed in kg per ton.
Term: Cycle Time
Definition:
The total time taken for a complete loading, hauling, and dumping operation by the scraper.
Term: Gross Weight
Definition:
The total weight of the machine, including the empty weight and the weight of the load.
Term: Safe Operating Weight
Definition:
The maximum weight that a machine can safely carry, as determined by the manufacturer.