Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.
Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.
Enroll to start learning
You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.
Listen to a student-teacher conversation explaining the topic in a relatable way.
Today, we'll discuss the angle of swing and its impact on productivity. Can anyone tell me what the angle of swing is?
Is it the angle at which the bucket moves while digging and dumping?
Exactly! The angle of swing is the horizontal angle between the digging and dumping positions. An ideal angle is 90 degrees. Remember, at this angle, productivity is maximized.
So, why is it problematic if the truck is too far from the excavator?
Good question! The further the truck, the larger the angle of swing, which increases the cycle time and reduces productivity. Think of it as a cost-benefit model!
Is there a way to calculate how much the productivity drops with a different angle?
Yes! You can use correction factors, which we will discuss later.
Can you recapitulate the key points we've covered?
Certainly! The angle of swing is vital in determining productivity, with a 90-degree swing being ideal. Keeping the truck close helps maintain that angle. Understanding these relationships is crucial for effective excavating operations.
Next, let's talk about the height of cut. Can someone explain what the optimal height of cut is?
Isn't it the ideal height at which the shovel should operate?
Yes! The optimal height usually ranges from 30% to 50% of the maximum digging height, depending on the material being excavated.
What happens if the actual height of cut is lower or higher than optimal?
Great point! If it’s lower, we apply a correction factor which decreases productivity. Conversely, if it’s higher, productivity also drops due to increased effort. The key is to maintain alignment between actual and optimal height.
Can you give us a formula for calculating this?
Sure! You calculate the percentage of optimum height as (Actual Height of Cut / Optimal Height of Cut) x 100. We’ll delve deeper into this with practical examples.
Can you summarize what we learned about height and correction factors?
Absolutely! The height of cut must be aligned with the optimal height for maximum productivity. Also, correction factors adjust the expected outputs based on these variances.
Now, let's discuss haul unit exchange time. What do you think this term refers to?
Is it the time taken to switch between trucks?
Correct! It's the time needed for a loaded truck to leave and an empty truck to arrive. Minimizing this time is crucial for maintaining a smooth operation.
How can we ensure that this time is minimized?
By matching the number of shovels with trucks, we can reduce waiting times. Does anyone recall why this balance is vital?
It's all about keeping the cycle time low, right?
Yes! Remember that productivity is highly affected by how efficiently these trucks can unload and reload. A well-balanced operation keeps things moving.
Please summarize what we discussed regarding haul unit exchange time.
Certainly! Haul unit exchange time is critical for ensuring productivity. Balancing the number of trucks and shovels reduces waiting times, optimizing workflow.
Finally, let's talk about estimating productivity. Who can summarize what we know about this process?
We need to consider the heaped volume of the bucket and the cycle time.
Exactly! We also need to multiply by job efficiency and any correction factors we discussed earlier. The formula looks something like this: Production = (Heaped Volume x Bucket Fill Factor x Correction Factors) / Cycle Time.
How do we relate it to real-life scenarios?
Great question! Let's consider an example linked to our operative parameters. If a shovel has certain measurements, we input them into this equation to find real productivity.
What’s the importance of job efficiency here?
Job efficiency accounts for downtime in an hour. If a shovel works effectively for, say, 50 minutes instead of 60, it must be factored into your productivity calculation.
Summarize productivity estimation for us.
To estimate productivity, you need the heaped bucket volume, cycle time, and job efficiency. Adjust for any correction factors to get the most realistic output.
Read a summary of the section's main ideas. Choose from Basic, Medium, or Detailed.
The section emphasizes the importance of optimal positioning for trucks and angles of swing in relation to excavators for maximizing productivity. Key terms like angle of swing, height of cut, and correction factors are introduced to help estimate excavation efficiency.
This section delves into the fundamental aspects of excavating operations, focusing on the critical relationships between excavators and trucks during material loading and dumping. The angle of swing is defined as the horizontal angle between the digging and dumping positions. It is emphasized that the ideal angle is 90 degrees, optimizing the efficiency of operations. Various factors affecting productivity, such as the height of the cut in relation to the excavator's capabilities, are explored. The importance of maintaining correction factors based on height and swing angle variations is also highlighted, thus affecting cycle time and overall productivity.
Particularly important concepts include:
The section concludes with an introduction to the backhoe and the differences in operations and applications compared to a front shovel.
Dive deep into the subject with an immersive audiobook experience.
Signup and Enroll to the course for listening the Audio Book
They have poor mobility. So, that is why it is preferable to place a truck very close to the excavator. So, very commonly you can see that the truck is placed at 90 degree. So, the truck is placed at 90 degree, this will be 90 to the bucket position. So, this is a common position.
Finding the correct position for the truck in relation to the excavator is crucial for operational efficiency. Because excavators have limited mobility, placing the truck too far away can increase the time taken for loading and dumping operations. Ideally, the truck should be placed so that it forms a 90-degree angle with the bucket position, which allows for efficient load transfer.
Imagine trying to pass a ball from a distance versus throwing it from right beside your friend. The closer you are, the easier and faster you can pass the ball. Similarly, having the truck near the excavator speeds up the loading process.
Signup and Enroll to the course for listening the Audio Book
So, basically angle of swing is nothing but the horizontal angle between the digging and the dumping position between the loading and the dumping position. As the truck moves further away, your angle of swing would increase as the angle of swing increases.
The angle of swing is important because it directly affects the cycle time of the excavator. If the truck is further away, the angle of swing increases, leading to longer movements of the bucket. This increase in movement can delay the entire loading and unloading process, thus reducing productivity.
Think of swinging a bucket on a string. The further the bucket is from you (the truck), the wider it needs to swing to reach the destination. This takes longer and requires more energy.
Signup and Enroll to the course for listening the Audio Book
As the angle of swing increases, you can see that your cycle time will increase, the productivity will decrease. So, angle of swing is the horizontal angle between the degree and the dumping positions of the bucket.
Cycle time refers to the total time taken for one complete loading or unloading process. When the angle of swing is greater, it requires more time to complete that cycle, and thus, the overall productivity diminishes. Therefore, maintaining an ideal angle of 90 degrees is not just preferable; it’s essential for optimizing efficiency.
If you're trying to fill a bucket with water from a river while standing on the bank, moving further from the river means you'll have to swing the bucket more to reach the water, wasting time and effort.
Signup and Enroll to the course for listening the Audio Book
Now, let us see what are all the adjustment factors, we have to apply while doing the productivity estimation based upon the height of the cut of material actual height of cut of material in your project site and based upon the angle of swing that is going to depend upon the position of your truck relative to the position of your excavator.
Adjustment factors are critical when estimating productivity as they account for deviations in height and swing angle from the ideal conditions. The actual height of the cut material should match the optimal height for maximum efficiency. If there are discrepancies, productivity can decrease and must be adjusted accordingly.
Think of baking a cake where precise measurements are crucial. If the quantity of flour (height of cut) doesn’t meet the recipe (optimal height), the quality (productivity) of your cake will suffer.
Signup and Enroll to the course for listening the Audio Book
If the actual height of cut is same as optimum height of cut, it means the percentage is 100% how do you calculate the percentage actual height of cut divided by optimum height of cut for the particular machine.
Calculating the percentage of actual height of cut against the optimum height provides a clear indication of whether a correction factor needs to be applied. A perfect match leads to no corrections, while varying heights can indicate lower productivity. Understanding and applying these factors ensures more accurate productivity estimates.
It’s like measuring your height with a perfect measuring tape (optimum). If you check yourself against it and you're exactly at the mark (100%), then there's no need for adjustments.
Signup and Enroll to the course for listening the Audio Book
Another thing to be noted is truck spotting clearance. That means, as I told you, it is preferable to place a truck closer to the excavator. But at the same time, note that there should be some space left for the tail swing of the shovel.
While placing the truck close to the excavator can enhance productivity, it is essential to ensure there is enough space for the excavator’s tail swing. This is crucial for preventing collisions and ensuring safe operations on site.
Imagine swinging your arm while trying to dance in a small room. If there’s no space, you'll hit something. Similar precautions are needed on construction sites to prevent accidents.
Signup and Enroll to the course for listening the Audio Book
Another important factor is haul unit exchange time. That means the time needed for the loaded truck to leave its position. And for a new truck that is an empty truck to take the position.
Haul unit exchange time affects productivity by determining how quickly a loaded truck can leave and an empty truck can take its place. Reducing this waiting time enhances overall efficiency on the worksite. Planning can involve balancing the number of trucks and excavators to minimize delays.
Think of a busy restaurant where servers need to quickly clear tables for new customers. If they take too long, customers will wait, just as delays in truck exchanges affect worksite productivity.
Signup and Enroll to the course for listening the Audio Book
Now let us see how to estimate the productivity of the shovel. So, for all these machines, the principle is going to be the same, you can see the formula everything is going to be similar only.
Estimating the productivity of an excavator involves understanding key factors such as bucket capacity, fill factor, and cycle time. The formula generally applies by calculating the volume of material it can move per hour based on these parameters.
If you think of an excavator as a giant spoon, the productivity can be compared to how many bowls of soup can be served in an hour based on the size of the spoon (bucket size) and the speed of serving (cycle time).
Learn essential terms and foundational ideas that form the basis of the topic.
Key Concepts
Angle of Swing: The critical measurement of horizontal movement during excavation, paramount for maintaining efficiency.
Height of Cut: The ideal vertical space maintained for effective excavation operations; closely tied to productivity levels.
Correction Factors: Numerical adjustments made based on variances in operational conditions for accurate productivity calculation.
Haul Unit Exchange Time: The important metric impacting overall cycle times and operational flow.
Job Efficiency: The ratio of time a machine effectively operates against total possible operational time, essential for productivity estimates.
See how the concepts apply in real-world scenarios to understand their practical implications.
If a truck is positioned at a 90-degree angle to the excavator, the cycle time can be reduced, enhancing productivity.
When the height of cut is maintained at the optimum level, there is a direct correlation with increased productivity outputs.
Use mnemonics, acronyms, or visual cues to help remember key information more easily.
To swing your shovel right and true, keep that angle ninety too.
Imagine an excavator at work. It sees a truck at the perfect angle, swinging smoothly without delay – a perfect job done every day.
To remember cut heights, think: 'Less is stress, more brings mess!'
Review key concepts with flashcards.
Review the Definitions for terms.
Term: Angle of Swing
Definition:
The horizontal angle between the digging and dumping positions of the excavator bucket.
Term: Height of Cut
Definition:
The vertical measurement at which the excavating operation is conducted, important for maintaining optimal productivity.
Term: Correction Factor
Definition:
A numerical value applied to account for deviations from ideal operational conditions affecting productivity.
Term: Haul Unit Exchange Time
Definition:
The duration required to clear a truck and replace it with a new hauling unit.
Term: Productivity
Definition:
The measure of the output of the excavator in terms of material moved or processed within a given time.
Term: Job Efficiency
Definition:
The effective operational time a machine is available for work within the measurement period, accounting for any downtime.