Practice Importance - 34.14.1 | 34. Design Earthquake | Earthquake Engineering - Vol 3
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

34.14.1 - Importance

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What are non-structural elements?

💡 Hint: Think about what parts of a building don't hold it up but serve important functions.

Question 2

Easy

Why is anchorage important?

💡 Hint: Consider what happens to loose items in an earthquake.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

Which of the following is a non-structural element?

  • Walls
  • Pipes
  • Columns

💡 Hint: Consider what parts of a building do not hold it up.

Question 2

True or False: Non-structural elements don't need to be designed for earthquakes.

  • True
  • False

💡 Hint: Think about safety during an earthquake.

Solve 1 more question and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

Design a small office space considering non-structural elements. List 4 non-structural components and explain how you would ensure their safety during an earthquake.

💡 Hint: Consider how elements interact during shaking.

Question 2

Evaluate a situation where non-structural elements failed during an earthquake. Discuss possible design improvements.

💡 Hint: Think about what could be done differently in the design phase.

Challenge and get performance evaluation