Drawing Line PR - 1.3 | 8. Square-root – time curve fitting method | Geotechnical Engineering - Vol 2
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

Interactive Audio Lesson

Listen to a student-teacher conversation explaining the topic in a relatable way.

Introduction to the Pressure Increment Curve

Unlock Audio Lesson

0:00
Teacher
Teacher

Today, we're learning about the pressure increment curve. Can anyone tell me why it’s essential to plot the dial reading against the square root of time?

Student 1
Student 1

It helps to visualize how the pressure affects consolidation over time?

Teacher
Teacher

Exactly! This plot gives us a clear view of the consolidation process. Remember, the relationship is quadratic, so the square root of time is key here.

Student 2
Student 2

What happens after we plot that?

Teacher
Teacher

Great question! We then draw a tangent, which helps us understand the initial rate of consolidation.

Drawing the Tangent PQ

Unlock Audio Lesson

0:00
Teacher
Teacher

Now, let’s focus on drawing the tangent PQ. Why do you think it's important to determine this point?

Student 3
Student 3

It shows us the slope of the curve?

Teacher
Teacher

Exactly! The slope gives us vital information about the rate of consolidation at that moment. This is crucial for later calculations.

Student 4
Student 4

What does that slope actually tell us?

Teacher
Teacher

The slope is related to the time rate of consolidation, which we need for predicting how long it will take for the soil to consolidate.

Understanding Line PR

Unlock Audio Lesson

0:00
Teacher
Teacher

Now, let’s draw line PR, positioned so that OR is 1.15 times OQ. Can anyone explain why we choose this specific ratio?

Student 1
Student 1

It sounds like a scaling factor to ensure we have a consistent measure?

Teacher
Teacher

Precisely! This ratio helps in scaling our estimates for field consolidation based on laboratory results.

Student 2
Student 2

What do we do next after drawing PR?

Teacher
Teacher

We identify the intersection point S with the curve, which indicates where the soil reaches a specific state of consolidation.

Predicting Consolidation

Unlock Audio Lesson

0:00
Teacher
Teacher

Finally, we use our derived points to predict the time taken by the soil sample to consolidate in the field. How do we ensure our predictions are accurate?

Student 3
Student 3

By comparing lab data with field observations?

Teacher
Teacher

Correct! It’s vital to ensure that our lab results reflect the behavior we see in the field.

Student 4
Student 4

What determines the length of the drainage path we’re considering?

Teacher
Teacher

Great point! The longer the drainage path, the more time we need for consolidation.

Introduction & Overview

Read a summary of the section's main ideas. Choose from Basic, Medium, or Detailed.

Quick Overview

This section explains the process of fitting a time curve for pressure increment measurements in soil consolidation.

Standard

The section details a step-by-step method for drawing a pressure increment curve, specifically focusing on the tangent method. This includes identifying key points on the curve and their significance for predicting consolidation in soil samples.

Detailed

Detailed Summary

The section on drawing line PR emphasizes the importance of accurately measuring the time rate of consolidation in soil mechanics. The first step involves plotting the dial reading against the square root of time, leading to a graphical representation that showcases the relationship between pressure increment and consolidation duration. A tangent (PQ) is drawn to the initial portion of the curve, which serves as a crucial reference point for deriving other significant values.

Following this, another line (PR) is created such that OR equals 1.15 times OQ, marking a critical aspect of the analysis. The intersection point (S) of this line with the curve represents a significant threshold in assessing soil consolidation over time. The section highlights the necessity of understanding the drainage path, as the required time for consolidation is directly proportional to this length. Lastly, the importance of utilizing laboratory measurements to predict field consolidation is also addressed.

Youtube Videos

S5 KTU 2019 Scheme QP Solution  | CE |GEOTECHNICAL ENGINEERING-|| | CET 305 |   Module 1 -  DEC 2022
S5 KTU 2019 Scheme QP Solution | CE |GEOTECHNICAL ENGINEERING-|| | CET 305 | Module 1 - DEC 2022
Geotechnical Engineering vs. Structural Engineering | What You Need to Know
Geotechnical Engineering vs. Structural Engineering | What You Need to Know
Geotechnical Engineering: Stress Distribution in Soil (Part 2)
Geotechnical Engineering: Stress Distribution in Soil (Part 2)
Getting Started: Geotechnical Engineering
Getting Started: Geotechnical Engineering
Target GATE 2025 | Geotechnical Engineering | Civil Engineering | Revision through PYQ
Target GATE 2025 | Geotechnical Engineering | Civil Engineering | Revision through PYQ
Geotechnical Engineering | Revision Through Questions | Civil
Geotechnical Engineering | Revision Through Questions | Civil
What Are The Latest Innovations In Geotechnical Engineering? - Civil Engineering Explained
What Are The Latest Innovations In Geotechnical Engineering? - Civil Engineering Explained
Index Properties of Soil | Geotechnical Engineering | Gate 2023 Civil Engineering (CE) Exam Prep
Index Properties of Soil | Geotechnical Engineering | Gate 2023 Civil Engineering (CE) Exam Prep
Geotech Engineering Formulas | GATE Formula Revision | GATE 2023 Civil Engineering | BYJU'S GATE
Geotech Engineering Formulas | GATE Formula Revision | GATE 2023 Civil Engineering | BYJU'S GATE
Geotechnical Engineering: Stresses in Soil (Part 2)
Geotechnical Engineering: Stresses in Soil (Part 2)

Audio Book

Dive deep into the subject with an immersive audiobook experience.

Plotting the Dial Reading

Unlock Audio Book

Signup and Enroll to the course for listening the Audio Book

  1. Plot the dial reading and square root of time i.e T for a pressure increment as shown in figure.

Detailed Explanation

In this step, you are required to create a visual representation by plotting the dial readings alongside the square root of time associated with a pressure increment. This means using a graph where one axis represents the dial reading and the other shows the square root of time (T). By plotting these points accurately, you can begin to analyze the relationship between pressure and time in the context of consolidation.

Examples & Analogies

Think of plotting the dial readings like measuring how a sponge absorbs water over time. As you apply pressure on the sponge, you want to see how quickly it absorbs the liquid. The graph acts like a time-lapse video showing this process.

Drawing a Tangent Line PQ

Unlock Audio Book

Signup and Enroll to the course for listening the Audio Book

  1. Draw a tangent PQ to the initial portion of the plot as shown in fig.

Detailed Explanation

This step involves drawing a tangent line (PQ) that touches the initial segment of the plot you've created. A tangent line is straight and represents the slope of the curve at that specific point, which can help in understanding how quickly the consolidation begins. It's crucial that this line runs parallel to your curve right at the starting portion of your graph, giving you important insights into the initial behavior of the consolidation process.

Examples & Analogies

Imagine you're pushing a sled on snow. The tangent line at the starting point represents the immediate motion of the sled when you first push it, capturing the sled’s initial acceleration.

Drawing Line PR

Unlock Audio Book

Signup and Enroll to the course for listening the Audio Book

  1. Draw a line PR such that OR=1.15OQ.

Detailed Explanation

In this step, you draw line PR based on a specific ratio to the previously drawn tangent PQ. The key here is to maintain the relationship where the distance from O to R is 1.15 times the distance from O to Q. This mathematical relationship can be crucial for further calculations and visual assessments in your analysis of the consolidation curve.

Examples & Analogies

Consider scaling a recipe. If you originally have a recipe that serves 4 and you need it to serve 5, you’d calculate what 1.15 times the ingredients would be. In this context, line PR represents those adjusted measurements important for the next steps.

Identifying Intersection Point S

Unlock Audio Book

Signup and Enroll to the course for listening the Audio Book

  1. The intersection of the line PR with the second portion of the curve i.e point S is marked.

Detailed Explanation

Here, you look for where your newly drawn line PR crosses the second segment of the curve from your initial plot. This point of intersection, referred to as point S, is critical as it helps you understand where the behavior of the consolidation process changes after the initial time you observed. Marking this point will be foundational in the next steps of your analysis.

Examples & Analogies

Imagine running a race. You note the exact moment you pass a mile mark (point S) after starting strong. This point helps you evaluate if you need to adjust your pace or strategy to continue effectively based on your earlier performance.

Definitions & Key Concepts

Learn essential terms and foundational ideas that form the basis of the topic.

Key Concepts

  • Plotting Dial Reading: Plotting the pressure increment against the square root of time gives insight into consolidation processes.

  • Tangent PQ: The tangent drawn to the initial curve indicates the rate of consolidation.

  • Line PR: This line is essential for determining the consolidation threshold and uses a specific ratio for calculation.

Examples & Real-Life Applications

See how the concepts apply in real-world scenarios to understand their practical implications.

Examples

  • If the total pressure applied to a soil sample is 100 kPa, and after plotting the dial readings, you find that the square root of time at certain intervals yields a clear linear trend, this suggests predictable consolidation behavior.

  • When the tangent line PQ is drawn and meets the curve at point T, you can calculate the slope as (change in pressure)/(change in time), illustrating how quickly consolidation is happening.

Memory Aids

Use mnemonics, acronyms, or visual cues to help remember key information more easily.

🎵 Rhymes Time

  • For consolidation's checking pace, draw the tangent, find your place!

📖 Fascinating Stories

  • Imagine a soil sample breathing under pressure; as we incrementally apply force, we measure its responses, drawing lines that guide us like a map.

🧠 Other Memory Gems

  • TANGENT: Tangential Assessment yields New Grounded Exploration of Time.

🎯 Super Acronyms

PR

  • Pressure Ratios guide our consolidation Predictions.

Flash Cards

Review key concepts with flashcards.

Glossary of Terms

Review the Definitions for terms.

  • Term: Pressure Increment Curve

    Definition:

    A graphical representation of the relationship between applied pressure and the resulting consolidation in soils over time.

  • Term: Tangent

    Definition:

    A straight line that touches a curve at a single point, representing the slope (rate of change) at that point.

  • Term: Consolidation

    Definition:

    The process of volume reduction in soil due to expulsion of water from its pores caused by applied pressure.