Plotting the Dial Reading - 1.1 | 8. Square-root – time curve fitting method | Geotechnical Engineering - Vol 2
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

Interactive Audio Lesson

Listen to a student-teacher conversation explaining the topic in a relatable way.

Plotting Dial Readings

Unlock Audio Lesson

0:00
Teacher
Teacher

Today, we are going to learn how to plot dial readings against the square root of time. When we plot these values, it provides us insight into the consolidation process. Why do you think plotting is important for understanding our experiment?

Student 1
Student 1

I think it helps us see the relationship between time and consolidation?

Teacher
Teacher

Exactly! It visually demonstrates how these two factors interact. When we plot our data, we're looking at the time-rate of consolidation, which is vital for our analysis. Can anyone tell me what we should do next after we plot the initial readings?

Student 2
Student 2

We draw a tangent to the curve, right?

Teacher
Teacher

Correct! We draw a tangent to the initial part of the curve to analyze the slope. This slope tells us about the rate of consolidation.

Understanding Graphical Relationships

Unlock Audio Lesson

0:00
Teacher
Teacher

Now that we have the tangent PQ, what does it signify in our graph?

Student 3
Student 3

It shows how fast the consolidation is occurring during that time!

Teacher
Teacher

Exactly! And understanding this is fundamental to our tests. Next, what do we need to do with line PR?

Student 4
Student 4

We need to make OR equal to 1.15 times OQ, correct?

Teacher
Teacher

Yes! This proportion helps us predict the time taken for consolidation at various points in our curve. Could you all explain why these proportions are necessary?

Student 1
Student 1

It gives us a way to compare and predict how long consolidation might take under different conditions!

Application in Real-World Scenario

Unlock Audio Lesson

0:00
Teacher
Teacher

Finally, how do we use our plotted data in practical applications?

Student 2
Student 2

We can predict how long it will take for consolidation in real field samples!

Teacher
Teacher

Absolutely! The time required to reach a certain level of consolidation can be estimated from these plots. Remember, this is critical for civil engineering and construction projects.

Student 4
Student 4

So if we know the thickness of a material, we can estimate how long it needs to settle?

Teacher
Teacher

Exactly, it helps in planning and ensuring safety in constructions!

Introduction & Overview

Read a summary of the section's main ideas. Choose from Basic, Medium, or Detailed.

Quick Overview

This section outlines the methods for plotting dial readings and understanding the time-rate of consolidation in materials.

Standard

In this section, we discuss the techniques for plotting dial readings against the square root of time. We highlight the importance of graphical representation in analyzing the time-rate of consolidation, emphasizing the relationship between the time required for consolidation and the drainage path length.

Detailed

In this section, we explore the methods of plotting dial readings in the context of consolidation tests. Firstly, we plot the dial reading (indicating consolidation over time) against the square root of time. This approach helps in visualizing the relationship between time and consolidation. Next, we draw a tangent (PQ) to the initial portion of the curve to determine the slope, which represents the rate at which consolidation occurs. A crucial step follows where we draw a line PR, ensuring that the intersection point S with the second curve section reflects the ratio of 1.15OQ. Understanding this graphical methodology is significant in predicting the time required for a specific degree of consolidation based on field deposit measurements and drainage path lengths.

Youtube Videos

GEOTECHNICAL ENGINEERING - II | Module 1 P1| S5 Civil KTU 2019 Scheme| Earth Pressure| CET305
GEOTECHNICAL ENGINEERING - II | Module 1 P1| S5 Civil KTU 2019 Scheme| Earth Pressure| CET305
Liquid Limit of Soil | Geotechnical Engineering  #mpsccivil #civilengineering
Liquid Limit of Soil | Geotechnical Engineering #mpsccivil #civilengineering
Plastic Limit of Soil | Geotechnical Engineering  #mpsccivil #civilengineering
Plastic Limit of Soil | Geotechnical Engineering #mpsccivil #civilengineering
See How Landslide Happens in This Experiment | Geotechnical and Civil Engineering
See How Landslide Happens in This Experiment | Geotechnical and Civil Engineering
Basic Information on Geotechnical Engineering : Read Caption
Basic Information on Geotechnical Engineering : Read Caption
Consolidation Test (Demo+Calculations) Solved Examples | English | Geotech with Naqeeb
Consolidation Test (Demo+Calculations) Solved Examples | English | Geotech with Naqeeb
Soil Density Test #engineering  #engineeringgeology #soilmechanics  #experiment  #science #soil
Soil Density Test #engineering #engineeringgeology #soilmechanics #experiment #science #soil
The Geotechnical Engineer's Report #shorts #structuralengineering
The Geotechnical Engineer's Report #shorts #structuralengineering
Consolidation Test Calculations of Soil|Height of Solids Method
Consolidation Test Calculations of Soil|Height of Solids Method
BIG UPDATE🚨|OPTION FORM FILLING STARTED✅|Step-by-Step Process To Fill Complete Option Form💡|
BIG UPDATE🚨|OPTION FORM FILLING STARTED✅|Step-by-Step Process To Fill Complete Option Form💡|

Audio Book

Dive deep into the subject with an immersive audiobook experience.

Plotting Dial Reading and Square Root of Time

Unlock Audio Book

Signup and Enroll to the course for listening the Audio Book

  1. Plot the dial reading and square root of time i.e T for a pressure increment as shown in figure.

Detailed Explanation

In this step, you need to plot the dial reading against the square root of time, which is represented as T. The dial reading typically indicates a certain measurement related to pressure increments, and plotting it against the square root of time helps visualize how these two quantities relate to one another over time. The resulting graph will help in understanding the behaviour of the tested sample under the applied pressure.

Examples & Analogies

Think of this plotting process like plotting the speed of a car against time. If you wanted to understand how fast your car accelerates, you would note the speed at regular time intervals and plot those points. Similarly, plotting dial readings against square root time reveals how the material responds to pressure over time.

Drawing a Tangent to the Initial Portion

Unlock Audio Book

Signup and Enroll to the course for listening the Audio Book

  1. Draw a tangent PQ to the initial portion of the plot as shown in fig.

Detailed Explanation

After plotting the data, the next step is to draw a tangent line (labeled PQ) that touches the initial steep part of the curve. This tangent will help illustrate the rate of change at that point. By observing the slope of this line, you can determine how quickly the material is consolidating at the beginning stages of the test.

Examples & Analogies

Imagine you are studying how quickly a sponge absorbs water when you first place it in a bowl. The initial rate of absorption can be depicted as a tangent line on your graph. Just like you would measure how fast the sponge soaks up water right when it touches the liquid, the tangent helps visualize how quickly consolidation is occurring at the beginning.

Drawing Line PR

Unlock Audio Book

Signup and Enroll to the course for listening the Audio Book

  1. Draw a line PR such that OR=1.15OQ.

Detailed Explanation

Here, you need to draw another line (labelled PR) extending in such a way that the length of OR is 1.15 times the length of OQ. This mathematical relation helps in comparing the various segments of the graph and makes it easier to analyze the data points. It provides a specific reference to the slope and how it relates to the consolidation process.

Examples & Analogies

Consider this action similar to measuring a piece of string that is exactly 1.15 times longer than another. If you have a short string (OQ), you find out what 1.15 times that length would be and mark it as OR. This step ensures that the relationships you draw on your graph accurately represent the changes observed in the material under study.

Marking The Intersection Point

Unlock Audio Book

Signup and Enroll to the course for listening the Audio Book

  1. The intersection of the line PR with the second portion of the curve i.e point S is marked.

Detailed Explanation

The final step is to find where the line PR intersects with the second section of the curve and label this point as S. This intersection is crucial because it indicates a significant point in the consolidation process. By marking this spot, you can understand how the material’s response changes in the consolidated phase.

Examples & Analogies

Think of this intersection like finding the point where a runner catches up with another runner on a track; the intersection determines where their paths converge, signifying an important moment in the race, much like how point S highlights a key point in material consolidation.

Definitions & Key Concepts

Learn essential terms and foundational ideas that form the basis of the topic.

Key Concepts

  • Square-root time method: A graphical analysis method that plots dial readings against the square root of time.

  • Rate of Consolidation: The speed at which soil consolidates under pressure, represented by the slope of the tangent line on the plot.

Examples & Real-Life Applications

See how the concepts apply in real-world scenarios to understand their practical implications.

Examples

  • Example 1: A consolidation test on a soil sample shows a dial reading increase of 0.5 mm over 25 minutes. If we plot this on a dial reading versus square-root time graph, we can analyze the consolidation rate.

  • Example 2: By drawing a tangent on a graph showing dial readings against time, we determine that the slope equals 0.02; this indicates the rate of consolidation is 0.02 mm/min at that instance.

Memory Aids

Use mnemonics, acronyms, or visual cues to help remember key information more easily.

🎵 Rhymes Time

  • When the dial shows its might, time brings the soil to tight!

📖 Fascinating Stories

  • Once upon a time, a soil sample was nervous. With a dial gauge by its side, it learned to measure time and wisely consolidate until it was just right.

🧠 Other Memory Gems

  • Remember 'TAN - Rate of consolidation', where T = Tangent, A = Analysis, N = New Measurement.

🎯 Super Acronyms

CATS - Consolidation Analysis Through Slope

  • A: guide to remember how to analyze consolidation rates!

Flash Cards

Review key concepts with flashcards.

Glossary of Terms

Review the Definitions for terms.

  • Term: Dial Reading

    Definition:

    A measurement is recorded from a dial gauge that indicates the displacement or deformation of a material due to consolidation.

  • Term: Consolidation

    Definition:

    The process whereby soil decreases in volume due to the expulsion of water from its pores, typically due to an applied load.

  • Term: Tangent

    Definition:

    A straight line that touches a curve at a given point without crossing over, used to analyze the slope at that point.