Practice Drawing the Tangent - 1.2 | 8. Square-root – time curve fitting method | Geotechnical Engineering - Vol 2
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What is the first step in drawing the tangent for pressure increments?

💡 Hint: Think about the axes of the graph.

Question 2

Easy

What does the tangent represent on the curve?

💡 Hint: Relate it to the slope.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What does the tangent PQ represent on the graphical plot?

  • The total pressure applied
  • The rate measured at a point
  • The average of all points

💡 Hint: Think about what tangent lines do in relation to curves.

Question 2

True or False: The consolidation time is the same regardless of the drainage path length.

  • True
  • False

💡 Hint: Consider how drainage paths affect time measurements.

Solve 2 more questions and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

You have a plotted curve of consolidation pressure readings. Explain how to determine where the tangent would touch and its significance for two different materials with varying permeability.

💡 Hint: Consider how quicker drainage would affect the tangent's slope.

Question 2

Given a monotonically increasing curve for time and consolidation, choose a point to draw the tangent and a line PR. Explain how variations in your method might affect the accuracy of predicting consolidation time.

💡 Hint: Think about what would happen with incorrect measurements.

Challenge and get performance evaluation