Effect of Trucks on Productivity

1.4 - Effect of Trucks on Productivity

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions

Question 1 Easy

What is the balance number of trucks for a loader if the truck cycle time is 39.5 minutes and the loader cycle time is 5.5 minutes?

💡 Hint: Use the formula: Truck Cycle Time / Loader Cycle Time.

Question 2 Easy

How would you calculate productivity if you have 6 trucks, each with a productivity of 12.53 cubic meters per hour?

💡 Hint: Multiply the number of trucks by each truck's productivity.

4 more questions available

Interactive Quizzes

Quick quizzes to reinforce your learning

Question 1

What determines the balance number of trucks?

Truck Cycle Time divided by Load Cycle Time
Loader Speed multiplied by Number of Trucks
Cost of Truck Operations

💡 Hint: Think about the formula for balance number.

Question 2

True or False: Increasing the number of trucks beyond the balance number decreases the total productivity.

True
False

💡 Hint: Recall the limitations of loaders when too many trucks are present.

2 more questions available

Challenge Problems

Push your limits with advanced challenges

Challenge 1 Hard

Calculate the total unit production cost when using the balance number of trucks, including the impact of excessive truck costs beyond this number.

💡 Hint: Use the unit cost formula and consider the effect of productivity limits.

Challenge 2 Hard

Design a scenario where the loader's downtime affects the balance point; suggest solutions to manage this downtime in truck operations.

💡 Hint: Reflect on how to integrate maintenance schedules into operational timelines.