Enrol to start learning
Reading is open to everyone. Enrolling is free, and it is what unlocks the audio lessons, practice tests and progress tracking.
23.3. Tunnel Boring Machines (TBMs): Semi-Robotic Systems
This section
Practice test
12 questions on this section. Wrong answers show you what to read again.
Sign up to take itWhole chapter
Revision test
Mixed questions from across the chapter. Your answers get marked.
Sign up to take itQuick
Flashcard drill
4 cards from this lesson. Good the night before a test.
Try these first
- 1.
What does a TBM do?
Hint
Think about its primary function.
- 2.
Name two main components of a TBM.
Hint
These are parts essential for its operation.
- 3.
What is the primary function of a TBM?
- To excavate tunnels
- To remove debris
- To install linings
Hint
Consider what TBM stands for.
- 4.
True or False: Hard Rock TBMs are designed for soft soil.
- True
- False
Hint
Think about the types of soil and rock they excavate.
- 5.
Evaluate the advantages and disadvantages of using a Slurry Shield TBM in an urban setting.
Hint
Consider the benefits and challenges of stability and safety.
- 6.
Design a TBM for a new underground project that includes mixed soil and hard rock conditions. Specify the type of TBM and justify your choice.
Hint
Think about the geological conditions and the machine’s capabilities.
Exercises
Total Questions
2
Estimated Time
4 min
Passing Score
70%
Instructions
- Read each question carefully
- You can use hints if you need help
- Complete all questions before submitting
4 more questions available
Enrol freeQuiz
Total Questions
2
Estimated Time
4 min
Passing Score
70%
Instructions
- Read each question carefully
- You can use hints if you need help
- Complete all questions before submitting
2 more questions available
Enrol freeChallenge Problems
Total Questions
2
Estimated Time
4 min
Passing Score
70%
Instructions
- Read each question carefully
- You can use hints if you need help
- Complete all questions before submitting