Practice As-Built Surveys - 15.6 | 15. Construction Surveys | Geo Informatics
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

15.6 - As-Built Surveys

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What is the primary purpose of as-built surveys?

💡 Hint: Think about what happens after construction.

Question 2

Easy

What tool is commonly used in as-built surveys?

💡 Hint: Consider the types of instruments used for measurements.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What is the main goal of as-built surveys?

  • A. To create new designs
  • B. To document completed structures
  • C. To conduct preliminary surveys

💡 Hint: Focus on what happens after construction is complete.

Question 2

True or False: As-built surveys are only necessary for large construction projects.

  • True
  • False

💡 Hint: Think about the role of documentation in all projects.

Solve 1 more question and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

During an as-built survey of a newly constructed bridge, it was found that the height was 3 feet lower than the plans specified. Discuss the potential impacts on safety and functionality.

💡 Hint: Consider how design specifications affect use and safety.

Question 2

An engineering team uses drone photogrammetry to create an as-built model but faces difficulties due to weather conditions. What alternative methods could they employ, and what impacts might those alternatives have?

💡 Hint: Think about balancing accuracy, time, and resource availability.

Challenge and get performance evaluation