Practice Electronic Distance Meter (EDM) - 12.1.2 | 12. Total Station Surveys | Geo Informatics
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

12.1.2 - Electronic Distance Meter (EDM)

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What does EDM stand for in surveying?

💡 Hint: Think about what it measures.

Question 2

Easy

What type of waves do EDMs use for distance measurement?

💡 Hint: These are part of the electromagnetic spectrum.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What does EDM stand for?

  • Electronic Distance Meter
  • Electromagnetic Distance Measurement
  • Electronic Dynamic Module

💡 Hint: Focus on what the device measures.

Question 2

True or False: The accuracy of an EDM using prisms is typically ±(2 mm + 2 ppm).

  • True
  • False

💡 Hint: Remember the accuracy values specified in the text.

Solve 1 more question and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

Consider a construction site where two EDMs measure the same distance but yield different readings due to environmental interference. Discuss potential causes for this discrepancy and methods to mitigate such effects.

💡 Hint: Think about how environmental conditions might change during a day.

Question 2

Analyze a scenario where an EDM is used incorrectly, resulting in an construction failure. What steps would you recommend to prevent this in future projects?

💡 Hint: Reflect on past mistakes that could lead to similar issues.

Challenge and get performance evaluation