Practice Preparation For Tape-out (9.3.1) - Physical Design Verification
Students

Academic Programs

AI-powered learning for grades 8-12, aligned with major curricula

Professional

Professional Courses

Industry-relevant training in Business, Technology, and Design

Games

Interactive Games

Fun games to boost memory, math, typing, and English skills

Preparation for Tape-Out

Practice - Preparation for Tape-Out

Learning

Practice Questions

Test your understanding with targeted questions

Question 1 Easy

What does DRC stand for?

💡 Hint: Think about what type of rules it checks.

Question 2 Easy

What is the primary purpose of LVS?

💡 Hint: Consider what LVS checks for in designs.

4 more questions available

Interactive Quizzes

Quick quizzes to reinforce your learning

Question 1

What is the main purpose of DRC?

To check logic correctness
To ensure layout adherence to rules
To verify electrical performance

💡 Hint: Think about what happens if rules are not followed.

Question 2

True or False? LVS checks if the schematic and layout are the same.

True
False

💡 Hint: Focus on what LVS stands for.

2 more questions available

Challenge Problems

Push your limits with advanced challenges

Challenge 1 Hard

A chip design has several DRC violations related to spacing. Discuss the steps you would take to address these before tape-out.

💡 Hint: Consider both the technical fixes and the need for verification.

Challenge 2 Hard

You encounter an issue where LVS indicates mismatches in a complex layout. How would you proceed to resolve this?

💡 Hint: Focus on understanding what the mismatches mean for intellactual integrity.

Get performance evaluation

Reference links

Supplementary resources to enhance your learning experience.