6 - Placing of Concrete
Enroll to start learning
You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.
Interactive Audio Lesson
Listen to a student-teacher conversation explaining the topic in a relatable way.
Guidelines for Placing Concrete
🔒 Unlock Audio Lesson
Sign up and enroll to listen to this audio lesson

Today, we're discussing how to properly place concrete. First, what do you think is crucial when placing fresh concrete?

I think we need to make sure it’s close to where it will finally be.

Correct! Placing concrete near its final position helps reduce waste and improves quality. Can anyone tell me some methods to achieve this?

Using chutes or tremies instead of dropping it from a height.

Exactly! Dropping it from a height can cause segregation. What about the thickness of the layers when we're placing concrete?

It should be around 150 to 300 mm in horizontal layers.

Right! And why is it important to compact each layer properly?

To ensure there are no voids and to improve strength!

Great responses! Remembering these guidelines helps ensure a durable and sturdy concrete structure.
Common Errors in Concrete Placement
🔒 Unlock Audio Lesson
Sign up and enroll to listen to this audio lesson

Now let's discuss common errors made when placing concrete. Can anyone suggest typical mistakes?

Delays in the process can lead to issues, right?

Absolutely! Delays can cause cold joints, where new and old concrete meet. What are some other errors?

Improper compaction can also be a big issue.

Exactly! Improper compaction leads to weaker concrete. Can someone explain what we can do to avoid these errors?

We could work efficiently and have a well-prepared plan for continuous pouring.

Well said! Stay aware of these pitfalls to maintain the integrity of your projects.
Introduction & Overview
Read summaries of the section's main ideas at different levels of detail.
Quick Overview
Standard
The section discusses essential guidelines for placing concrete, focusing on the importance of positioning the material close to its final location and promoting effective compaction. It also identifies common mistakes that can lead to defects in the concrete structure, such as delays and improper compaction, and emphasizes the need for careful handling during this critical phase of construction.
Detailed
In the section titled 'Placing of Concrete', several key aspects of handling fresh concrete are outlined to ensure optimal performance post-setting. It starts with guidelines for effectively placing concrete, emphasizing that it should be positioned as near its final location as possible to minimize segregation and waste. Key practices include avoiding dropping into forms from a height, using chutes or tremies to direct placement, and laying down layers of concrete that are 150–300 mm thick while ensuring proper compaction of each layer before placing the next. The section further highlights common errors made during concrete placement, including delays which can lead to cold joints, inadequate compaction that compromises structural strength, and interruption-related issues that affect the integrity of the concrete. Understanding and implementing these guidelines is critical for achieving the desired strength, durability, and overall performance of concrete structures.
Youtube Videos










Audio Book
Dive deep into the subject with an immersive audiobook experience.
Guidelines for Placing Concrete
Chapter 1 of 2
🔒 Unlock Audio Chapter
Sign up and enroll to access the full audio experience
Chapter Content
• Concrete should be placed as near as possible to its final position.
• Avoid dropping from heights (use chutes or tremie).
• Place in horizontal layers of 150–300 mm.
• Compact each layer properly before placing the next.
Detailed Explanation
The guidelines for placing concrete emphasize the importance of minimizing the distance concrete travels before it reaches its final position. This ensures that its integrity remains intact. It's crucial to avoid dropping concrete from heights because it can lead to segregation; instead, using tools like chutes can help funnel the concrete safely. The concrete should be placed in layers, ideally between 150 to 300 mm thick. After placing each layer, proper compaction ensures that the concrete is dense and free of air pockets, which contributes to the overall strength and durability of the structure.
Examples & Analogies
Think of placing concrete like stacking books on a shelf. If you drop the books from a height, they might get damaged or fall apart. Instead, you would carefully place each book on the shelf, making sure they are stacked properly. Similarly, placing concrete in controlled layers helps maintain its strength and structure.
Common Errors in Placing Concrete
Chapter 2 of 2
🔒 Unlock Audio Chapter
Sign up and enroll to access the full audio experience
Chapter Content
• Delays in placing.
• Cold joints due to interruptions.
• Improper compaction.
Detailed Explanation
Common errors during the concrete placing process can lead to significant structural issues. Delays in placing can result in the concrete beginning to set before it's fully laid down, causing weakness where new and old concrete meet. This creates what is known as 'cold joints.' These joints can compromise the strength and aesthetics of the finished product. Additionally, if compaction is not done correctly, air pockets may remain in the concrete, resulting in a less dense and weaker structure. Therefore, it’s essential to have a smooth flow during the placing operation to avoid these pitfalls.
Examples & Analogies
Imagine making a cake where you mix the ingredients but take too long to bake it. If you leave the batter out too long, it might start to set or spoil, leading to a poorly baked cake. Similarly, if concrete is not placed promptly or compacted properly, it won’t set correctly, jeopardizing the strength of the entire structure.
Key Concepts
-
Proper positioning of concrete: Place fresh concrete as near its final position as possible.
-
Layer thickness: Concrete should be laid in horizontal layers of 150-300 mm.
-
Compaction importance: Each layer must be compacted to avoid voids and improve strength.
-
Cold joints: Delays in placement can create weak points in the structure.
Examples & Applications
During a construction project, using a tremie to place concrete underwater ensures minimal disturbance and avoids segregation.
If a contractor delays the placement of fresh concrete for too long, it can result in cold joints that weaken the overall structure.
Memory Aids
Interactive tools to help you remember key concepts
Rhymes
Avoid the drop, keep it close, place it right, we honor the most.
Stories
Once, a builder had a pile of concrete but dropped it from high, causing a messy mix below. He learned to use a chute, making the process smooth like a flow.
Memory Tools
P.C.L. - Place correctly, layer it thin, compact well to make sure you win.
Acronyms
D.A.C. - Don't Allow Cold joints.
Flash Cards
Glossary
- Concrete Placement
The process of positioning and situating fresh concrete in a specific location before it sets.
- Cold Joint
A weak seam formed when new concrete is placed against hardened concrete.
- Compaction
The process of densifying concrete to eliminate air voids and ensure it is fully bonded.
Reference links
Supplementary resources to enhance your learning experience.