Practice Quality Control of Fresh Concrete on Site - 15 | 8. Workability of Fresh Concrete | Concrete Technology
K12 Students

Academics

AI-Powered learning for Grades 8–12, aligned with major Indian and international curricula.

Professionals

Professional Courses

Industry-relevant training in Business, Technology, and Design to help professionals and graduates upskill for real-world careers.

Games

Interactive Games

Fun, engaging games to boost memory, math fluency, typing speed, and English skills—perfect for learners of all ages.

15 - Quality Control of Fresh Concrete on Site

Enroll to start learning

You’ve not yet enrolled in this course. Please enroll for free to listen to audio lessons, classroom podcasts and take practice test.

Learning

Practice Questions

Test your understanding with targeted questions related to the topic.

Question 1

Easy

What is the purpose of visual inspection in concrete quality control?

💡 Hint: Think about what visible signs indicate quality.

Question 2

Easy

What is the slump test used for?

💡 Hint: Consider how a change in water content would affect concrete workability.

Practice 4 more questions and get performance evaluation

Interactive Quizzes

Engage in quick quizzes to reinforce what you've learned and check your comprehension.

Question 1

What does the slump test measure?

  • A) Concrete strength
  • B) Workability
  • C) Temperature

💡 Hint: Think about how well the concrete can be worked during placement.

Question 2

True or False: Visual inspections are often the first step in quality control of fresh concrete.

  • True
  • False

💡 Hint: Recall what comes before conducting tests.

Solve 1 more question and get performance evaluation

Challenge Problems

Push your limits with challenges.

Question 1

You find that the slump test consistently shows a drop below the acceptable range. Discuss the potential implications and corrective action plans.

💡 Hint: Think about how variations in materials can affect results.

Question 2

A contractor is mixing concrete in varying conditions every day but taking samples at the same frequency. What issues might arise and how can this be resolved?

💡 Hint: Consider how environmental factors can change the mix's behavior.

Challenge and get performance evaluation